Sterling SSk-3 operating instructions Outlet flap

Page 23

SM3-610

SSK-3

Outlet flap

Draw the old sealing ring (A) off the nozzle of the material outlet. Install the new sealing ring (A).

FObserve the direction of installation (B).

Install the hopper.

&

Order number sealing ring: ID 29258

 

 

180 °

AB

Installation sealing ring

Maintenance 22

Image 23
Contents Sterling Material Processing SSK-3Telephone 800 Edition 12/97 Technical serviceSSK-3 Parts and Service Department Table of contents Safety instructions Safety instructionsSSK-3 Explanations and information For the safety of the equipment For your safetyInstallation instructions Set-up TransportSSK-3 Compressed-air supply only with compressed-air valves Electrical connection SSK-3 Functional description Functional descriptionMaintenance SSK-3 Maintenance intervals Disassembling the hopper SSK-3 Replace the sealing rings Nonreturn valve Outlet flap Adjust the flap switch Cleaning the hopper Spare parts list Spare parts listSSK-3 Dimension sheet Technical data