Sterling SSk-3 operating instructions Disassembling the hopper

Page 20

SSK-3

4.2. Disassembling the hopper

&

Individual hoppers can also be maintained during operation. However, Sterling recommends that you switch off the con- veying plant for all types of work on the hopper.

Wait until the conveying procedure has stopped.

Switch off the hopper by means of the on/off switch (A) on the connection hous- ing.

Disassemble the vacuum line on the hopper.

Close the disassembled vacuum line so that the vacuum for the active hop- per-loaders does not break down.

SM3-610

A

B

Connection housing hopper

Maintenance 19

Image 20
Contents SSK-3 Sterling Material ProcessingTechnical service Telephone 800 Edition 12/97SSK-3 Parts and Service Department Table of contents Safety instructions Safety instructionsSSK-3 Explanations and information For your safety For the safety of the equipmentInstallation instructions Transport Set-upSSK-3 Compressed-air supply only with compressed-air valves Electrical connection SSK-3 Functional description Functional descriptionMaintenance SSK-3 Maintenance intervals Disassembling the hopper SSK-3 Replace the sealing rings Nonreturn valve Outlet flap Adjust the flap switch Cleaning the hopper Spare parts list Spare parts listSSK-3 Technical data Dimension sheet