Sterling SSk-3 operating instructions SSK-3

Page 18

L

SSK-3

Disconnect the equipment from mains supply before starting maintenance procedures to ensure that it cannot be switched on unintentionally.

Depressurize all compressed air piping of the equipment be- fore starting maintenance work.

F

Please observe the maintenance intervals.

Before starting maintenance work, clean the equipment of oil, fuel or lubricants.

Ensure that materials and incidentals required for operation as well as spare parts are disposed of properly and in an envi- ronmentally sound manner.

Use only original Sterling spare parts.

Keep record of all maintenance and repair procedures.

SM3-610

Maintenance 17

Image 18
Contents SSK-3 Sterling Material ProcessingTechnical service Telephone 800 Edition 12/97SSK-3 Parts and Service Department Table of contents Safety instructions Safety instructionsSSK-3 Explanations and information For your safety For the safety of the equipmentInstallation instructions Transport Set-upSSK-3 Compressed-air supply only with compressed-air valves Electrical connection SSK-3 Functional description Functional descriptionMaintenance SSK-3 Maintenance intervals Disassembling the hopper SSK-3 Replace the sealing rings Nonreturn valve Outlet flap Adjust the flap switch Cleaning the hopper Spare parts list Spare parts listSSK-3 Technical data Dimension sheet