| |
4.1. Maintenance intervals |
|
Daily: | Check warning signs on equipment for good |
| legibility and completeness. |
| With |
| check the oil level in the oiler |
| empty the water separator |
| check the operating pressure in the factory |
| ductwork system |
| (max. 6 bar (87.02 PSI) system overpressure) |
Every six months: | Check all electrical and mechanical |
| connections for proper fit |
| Check the settings of the level probes |
| Check the sealing rings on the locking flaps |
Yearly: | Replace the sealing rings on the locking flaps |