Sterling SSk-3 operating instructions Maintenance intervals

Page 19

 

SSK-3

4.1. Maintenance intervals

 

Daily:

Check warning signs on equipment for good

 

legibility and completeness.

 

With compressed-air valve:

 

check the oil level in the oiler

 

empty the water separator

 

check the operating pressure in the factory

 

ductwork system

 

(max. 6 bar (87.02 PSI) system overpressure)

Every six months:

Check all electrical and mechanical

 

connections for proper fit

 

Check the settings of the level probes

 

Check the sealing rings on the locking flaps

Yearly:

Replace the sealing rings on the locking flaps

SM3-610

Maintenance 18

Image 19
Contents Sterling Material Processing SSK-3Telephone 800 Edition 12/97 Technical serviceSSK-3 Parts and Service Department Table of contents Safety instructions Safety instructionsSSK-3 Explanations and information For the safety of the equipment For your safetyInstallation instructions Set-up TransportSSK-3 Compressed-air supply only with compressed-air valves Electrical connection SSK-3 Functional description Functional descriptionMaintenance SSK-3 Maintenance intervals Disassembling the hopper SSK-3 Replace the sealing rings Nonreturn valve Outlet flap Adjust the flap switch Cleaning the hopper Spare parts list Spare parts listSSK-3 Dimension sheet Technical data