Sterling SSk-3 operating instructions Electrical connection

Page 14

SSK-3

2.4. Electrical connection

»

The electrical connection may only be carried out by trained per- sonnel.

Other persons are not permitted to carry out the electrical con- nection.

The rules of the local electricity board must be observed.

Before beginning the electrical connection, make sure that the mains voltage and the power frequency are in accordance with the data on the name plate of the device.

All work may only be carried out when the unit is at zero voltage and at zero pressure.

SM3-610

Connection point diaphragm valve (SV) Connection point SKW

Connection point probe

Connection plug “flap switch (KL)”

Connection plug “conveyor control”

Plug connection connection housing hopper

Installation instructions 13

Image 14
Contents SSK-3 Sterling Material ProcessingTechnical service Telephone 800 Edition 12/97SSK-3 Parts and Service Department Table of contents Safety instructions Safety instructionsSSK-3 Explanations and information For your safety For the safety of the equipmentInstallation instructions Transport Set-upSSK-3 Compressed-air supply only with compressed-air valves Electrical connection SSK-3 Functional description Functional descriptionMaintenance SSK-3 Maintenance intervals Disassembling the hopper SSK-3 Replace the sealing rings Nonreturn valve Outlet flap Adjust the flap switch Cleaning the hopper Spare parts list Spare parts listSSK-3 Technical data Dimension sheet