Genesis Advanced Technologies
GRXXX &
manual
Atlas & Yukon
Troubleshooting
Install
Disassembly Procedures
Cleaning Procedures
Orifice Preliminary Setting
Flowbench Testing optional
Scheduled Service
Page 1
Atlas & Yukon
(Part Numbers GRXXX & )
Second Stage
S
ERVICE
& R
EPAIR
G
UIDE
Page 1
Page 2
Image 1
Page 1
Page 2
Contents
Atlas & Yukon
Contents
About This Manual
Scheduled Service
Introduction
Function & Design
Facility Requirements
Atlas/ Yukon Specialty Tools
Recommended Equipment and Suppliers
External Inspection
Preliminary Inspection
Immersion / Leak Test
General Guidelines
Disassembly Procedures
Serial Number Location
Orifice Removal
Cover Ring Removal
Exhaust Tee Removal Step
Atlas Retaining Ring Removal
Atlas Second Stage Only
Acidic Cleaning Procedure
Cleaning Procedures
Fresh Water Rinse
Degrease & Pre-Scrub
Ultrasonic Acid Bath
Final Rinse
Neutralizing Bath
For Equipment Used With Oxygen Enriched Air Introduction
EAN/Nitrox Cleaning Procedure
Required Equipment
Preparing the Workstation
Ultrasonic Aqueous Bath
Demineralized or Distilled Water Rinse
Final Inspection
LOW Pressure Hose Assemblies
Labeling & Packaging
Final Adjustment & Flow Testing
Reassembly Procedures
Atlas Second Stage Only Yukon proceed to Step
Atlas Retaining Ring Installation
Pop p et Installation
Orifice Preliminary Setting
Inline Adjustment Tool w/ IP Gauge
Final Testing Procedures
Service & Repair Manual
Subjective Breathing Test
External Leak Test
Flowbench Testing optional
Freeflow or leakage
Troubleshooting Guide
EAN/Nitrox & Compressed Air
Schematic & Parts List Atlas Second Stage
Page
G6621 Orifice G5117 Washer
Schematic & Parts List Yukon Second Stage
Related pages
How does
refrigerant migration
affect chiller design capacity?
Top
Page
Image
Contents