Genesis Advanced Technologies GRXXX & manual Orifice Preliminary Setting

Page 27

observe locknut

Fig. 18 – Orifice Preliminary Setting

extended ridge

Fig. 19 – Orthodontic Mouthp iece Orientation

Service & Repair Manual

16.Apply a medium blade screwdriver to engage the slotted head of the orifice, and turn it clockwise approximately 5 full revolutions. Then, grasp the screwdriver by the shaft, rather than the handle, for best sensitivity of touch. Con- tinue turning the orifice very slowly while closely observing the locknut on the end of the poppet (see Fig. 18). STOP turning the orifice when the locknut begins to move slightly. This will indicate that the orifice has made contact against the LP seat.

CAUTION: Do not continue to turn the orifice further be- yond the point where it makes contact with the low pressure seat. Doing so may damage the LP seat or sealing surface of the orifice, requiring their replacement, and can also re- sult in an incorrect adjustment of the second stage.

17.Lay the diaphragm(3) inside the case, directly over the lever, with its raised surface facing up.

18.Fit the diaphragm cover(2) inside the case so that it seats directly over the diaphragm. Adjust as needed to align the logo parallel with the inlet coupling.

19.Mate the cover ring(1) over the diaphragm cover and into the case, and turn it clockwise by hand until snug. Be careful to avoid over-tightening.

20.Install the mouthpiece(12) onto the mouthpiece tube of the case, with the extended ridge facing up to accommodate the natural overbite of the human jaw (see Fig. 19). Fit a tie-strap(14) over the mouthpiece with the locking tab facing toward the inlet coupling, and cinch it completely snug. Snip off the excess strap that extends outside the locking tab.

After completing the reassembly of the second stage, proceed to Section 6 – Final Testing

27

Copyright ©2001 Liberty Group

Image 27
Contents Atlas & Yukon Contents About This Manual Scheduled ServiceIntroduction Function & DesignFacility Requirements Atlas/ Yukon Specialty Tools Recommended Equipment and SuppliersPreliminary Inspection External InspectionImmersion / Leak Test General Guidelines Disassembly ProceduresSerial Number Location Orifice Removal Cover Ring Removal Exhaust Tee Removal Step Atlas Retaining Ring Removal Atlas Second Stage OnlyAcidic Cleaning Procedure Cleaning ProceduresDegrease & Pre-Scrub Fresh Water RinseUltrasonic Acid Bath Final Rinse Neutralizing BathFor Equipment Used With Oxygen Enriched Air Introduction EAN/Nitrox Cleaning ProcedureRequired Equipment Preparing the WorkstationUltrasonic Aqueous Bath Demineralized or Distilled Water Rinse Final Inspection LOW Pressure Hose Assemblies Labeling & Packaging Final Adjustment & Flow TestingReassembly Procedures Atlas Second Stage Only Yukon proceed to Step Atlas Retaining Ring InstallationPop p et Installation Orifice Preliminary Setting Inline Adjustment Tool w/ IP Gauge Final Testing ProceduresService & Repair Manual Subjective Breathing Test External Leak Test Flowbench Testing optionalFreeflow or leakage Troubleshooting GuideEAN/Nitrox & Compressed Air Schematic & Parts List Atlas Second StagePage G6621 Orifice G5117 Washer Schematic & Parts List Yukon Second Stage