Nordyne M3RL Series installation instructions INSTALLATION/PERFORMANCE Check List, Fuel Type

Page 35

INSTALLATION/PERFORMANCE CHECK LIST

LOCATION ____________________

CITY __________________

STATE

____________

INSTALLER ___________________

CITY __________________

STATE

____________

UNIT MODEL NUMBER ________________

Minimum Clearances per Table 3? ________

Electrical Connections tight? _____________

Line Voltage Polarity correct? ____________

Supply Voltage: ___________________ Volts

Blower Motor HP: _____________________

FUEL TYPE:

Natural Gas ______ LP/Propane _______

Gas Piping Connections leak-tested? _____

Gas Line Pressure: ____________________

(in. water column, with furnace operating) Manifold Pressure: ____________________

(in. water column, with furnace operating) Is there adequate fresh air supply for combustion and ventilation? _____________

Furnace Input: _________________

(Btuh)

Supply Air Temperature: __________

(° F)

Return Air Temperature: _________

(° F)

Temperature Rise: ______________

(° F)

UNIT SERIAL NUMBER ________________

Are Flue Connections tight? _____________

Is there Proper Draft? __________________

Is Vent free from restrictions? ____________

Is the Filter(s) secured in place? __________

Is the Filter(s) clean? __________________

Has the Thermostat been calibrated? _____

Is the Thermostat level? ________________

Is the Heat Anticipator Setting correct? ____

Has the Owner's Information been reviewed with the home-owner? _________________

Has the Literature Package been left near the furnace? ____________________________

35

Image 35
Contents Installation Instructions Page L 060 a a W Table of ContentsTop View Shipping WeightFurnace Specifications/Airflow Data GeneralGeneral Description Owner InformationManufacturer WARRANTY, OWNER’S Responsibilities Installation StandardsMinimum Clearances LocationCirculating AIR Supply Return AIR Provisions Duct ConnectorsDucted Return AIR Closet or AlcoveAIR Distribution Systems Duct Connector SelectionDuct Installation Screw Down Platinum Series Installing Platinum Series 14 Round Duct ConnectorInstalling Screw Down Duct CON- Nector CUT Duct Opening Finger Tabbed onlyAlternate Attachment Methods Installing Finger Tabbed Duct CON- NectorsGeneral Install FurnaceVenting and Combustion AIR Requirements Furnace Must not be Common Vented with Other Appliances Venting RequirementsVent Termination Clearances for Direct Vent Furnaces Vent TableVent Pipe Material Vent Pipe InstallationHorizontal Venting Downflow FurnaceHorizontal Venting Drainage of Condensate from Furnace Alternate Horizontal Vent InstallationGAS Supply and Piping Furnace with Condensate Drain Trap AssemblyTo Turn Off Fuel Supply to the Appliance ConversionLeak Check High Altitude DerateApproximate Orifice Size for Natural and LP Gases To Remove the Burner AssemblyTo Remove the Burner Orifices To Convert the Unit to the Alternate GasConvertible Pressure Regulator Cap Lighting and Adjustment of the ApplianceCompleting the Conversion Electrical WiringLine Voltage Wiring Type of Fuel Manifold PressureElectrical Data Low Voltage WiringVentilation START-UP and AdjustmentsStart-Up Procedure Verifying Firing Rate Shut Down ProcedureSequence of Operation Verifying Burner Operation Verifying Operation of the Supply Air Limit SwitchDescription of Components Gas Flow RateAir Filter MaintenanceAccessory Kits Combustion Air and Vent SystemBlower Compartment Condensate Drain AssemblySystem Operation Information LubricationFurnace Fails to Operate Cooling Mode M3 Downflow Furnace Downflow Furnace Wiring Diagram Page Fuel Type INSTALLATION/PERFORMANCE Check List¢7082197¤