Martin Fireplaces BV4536 To Locate and install Vertical Termination, Outside Air Kit Installation

Page 15

VENT INSTALLATION

NOTE

When working on the roof, cover the opening of the installed vent pipes below to prevent debris falling in.

To Locate and install Vertical Termination

Locate and mark the vent center point on the underside of the roof, and drive a nail through the center point.

The size of the roof hole framing dimensions depends on the pitch of the roof

Cut and frame the roof hole.

Continue to install vent sections through the roof hole until reaching the appropriate distance above the roof.

Attach a flashing to the roof using nails, and use a non-hardening mastic around the edges of the flashing base when it meets the roof.

Attach a storm collar over the flashing joint to form a watertight seal. Place non-hardening mastic around the joint, between the storm collar and the vertical pipe.

Attach termination per pipe manufacturer’s instructions.

Outside Air Kit Installation:

Warning

To operate this appliance, the outside air kit MUST be installed and operational. Operation without the outside air kit may result in high temperature on combustible materials and possible spillage of combustion product into the living area.

1.Attach aluminum flexible hose (#2) to outside air door (#1) on the appliance, securing it with a spring clamp (#3).

2.Cut a hole through outside wall, place outside air hood (#4) in hole and secure with sealant.

3.Attach other end of flex hose (#2) to outside air hood, securing it with a spring clamp (#3).

Figure 11: Outside Air Kit Installation

14

Image 15
Contents Super B-VENT GAS Fireplace Table of Contents Important Safety Information Important Safety InformationAlways Burn Propane Models with Doors Closed Model LAB Type Certification Standard Product SPECIFICATIONS/LISTING & Code ApprovalProduct Specifications Listing & Code ApprovalPRE-INSTALLATION Information PRE-INSTALLATION InformationFireplace Dimensions PRE-INSTALLATION Information Combustible Clearances Mantel Clearance Floor Clearances Mantel ClearancesPRE-INSTALLATION Information Dim Min Max Feet Vent InstallationVent Installation Vertical Venting Straight up No ElbowInstalling Vent Components Piping InstallationsVertical Venting with Two 2 45 Degree Elbow To Locate and Install Ceiling Firestop For Vertical Termination Ceiling Firestop Location Vent TerminationOutside Air Kit Installation To Locate and install Vertical TerminationDo not use open flame to check for gas leaks GAS Line and ElectricalRemote Wall Switch Standing Pilot Ignition Wiring-Millivolt ControlComplete Millivolt System Check Millivolt Control Valve ChecklistOptional DC Remote Systems Thermopile Output CheckWiring Diagram for Electronic Ignition System Electronic Pilot Ignition WiringGAS Line and Electrical Installation Definitions Final InstallationLog Placement Log Placement for fiber VDY24/18D3RDoor Rail Installation Damper Operation Hi Temperature Cut Off Disc You may notice the following Operating InstructionsBefore Lighting the Fireplace Lighting the FireplaceLighting Instructions Millivolt Control Lighting Instructions Electronic IGN Burner Flame MaintenanceMaintenance Standing-Pilot Flame OnlySoot cleaning fluid may be used on refractory logs Vent SystemGlass Door Parts List / Illustration Parts List / IllustrationsConversion Kit Not Shown for MillivolControl Only Conversion Kit Not Shown for Electronic Ignition Page Electronic Ignition General Troubleshooting 41D2001 Rev 3 Dec Limited Lifetime Warranty Policy