Figures 16 through 20 show different con- figurations for venting with horizontal ter- mination. Each figure includes a chart with vertical minimum/maximum and horizon- tal maximum dimensions which must be met. Seal all connections with high tem- perature silicone sealant (outer pipe only) as specified in the second warning statement on page 7. All horizontal terminations re- quire 1/4" rise per 12" of horizontal run.

Horizontal Venting

 

UP

Vertical (V)

Horizontal (H)

44" min.

29" max.

(30° and 90° only, no vertical pipe)

55" min.

41" max.

(30° elbow, 1' vertical pipe, 90° elbow)

67" min.

60" max.

79" min.

84" max.

96" min.

20' max.

Note: This configuration for use with

corner installation.

BVK Vent Kit Shown

Figure 17 - Horizontal Termination Configuration for Rigid Venting Using One 90° Elbow

UP

BGFVK Vent Kit Shown (recommended for use with cabinet mantels)

Horizontal Venting

Vertical (V)

Horizontal (H)

37" min.

10" max.

Figure 16 - Horizontal Termination Con- figuration for Rigid Venting

Horizontal Venting

See information in Figure 17 for Vertical(V) and Horizontal(H) maxi- mums and minimums. The same amounts apply for flexible venting.

Note: Figure 16 applies to rigid venting only.

UP

BFGFVK and FGFVK Vent Kits Shown

Figure 18 - Horizontal Termination Using Flexible Venting

10

106516

Image 10
Contents For Your Safety What to do if YOU Smell GAS For Your SafetyNatural GAS Model BHDV34NB PROPANE/LP GAS Model BHDV34PB Safety Information Local Codes Product FeaturesProduct Identification Glossary TermsLocation and Space Requirements PRE-INSTALLATION PreparationClearances Framing and FinishingGeneral Venting Location of Vent TerminationGeneral Venting Installation Planning Venting InstallationInstallation Precautions Installing Vent System in a ChaseInstallation for Horizontal Termination Snorkel TerminationVent Pipe Connections Horizontal Termination Configurations Horizontal VentingVenting with Two 90 Elbows Flat Ceiling Installation Installation for Vertical TerminationCathedral Ceiling Installation Vertical Termination Configurations Venting with One 90 ElbowVertical Venting Venting Installing GA3700/DA3610TA Blowers Fireplace InstallationInstalling Optional Blower Accessory Check GAS TypeSide View Installing GAS Piping to Fireplace Location Installation Items NeededPressure Testing Gas Supply Piping System Connecting Fireplace to GAS SupplyChecking GAS Connections Pressure Testing Fireplace Gas Connections Close equipment shutoff valve see Fig- ureInstalling Optional Wall Mounted Thermostat GWMT1 Installing Optional Wall Mount Switch GWMS2Installing 9-Volt Battery in Hand- Held Remote Control Unit Installing 9-Volt Alkaline Battery into ReceiverREMOVING/REPLACING Glass Door Installing Optional Brick Liner D8037A Installing Left Side Brick PanelInstalling LOGS, Lava Rock and Glowing Embers Shown in FigureOperating Fireplace Ghrc Series Operation Operating Optional Blower AccessoryGhrcta Series Operation Inspecting Burners Operating Optional GWMS2 Wall Mounted SwitchPilot Assembly Operating Optional GWMT1 Wall Mounted ThermostatPilot and Burners Cleaning and MaintenanceGlass Door Venting SystemTroubleshooting Observed Problem Possible CauseObserved Problem Possible Cause Remedy Gas leak. See Warning statement Technical Service Replacement PartsWiring Diagram Service HintsSpecifications BHDV34NB BHDV34PBAccessories Brass Louver KIT Receiver and HAND-HELD Remote Control KIT Ghrc SeriesDuplex Outlet KIT Manual Blower KIT GA3700Illustrated Parts Breakdown BHDV34NB BHDV34PB33Parts List DIRECT-VENT Fireplace BHDV34NB BHDV34PBWarranty Information