Vanguard Managed Solutions BHDV34PB Venting Installation, Installation Precautions

Page 7

OWNER’S MANUAL

VENTING INSTALLATION

WARNING: Read all instruc- tions completely and thoroughly before attempting installation. Failure to do so could result in serious injury, property damage or loss of life. Operation of im- properly installed and maintained venting system could result in serious injury, property damage or loss of life.

WARNING: Seal all vent con- nections. Seal only the outer pipe connectionswithhightemperature silicone (600°F/316°C). Before join- ing elbows and pipes, apply a bead of high temperature silicone seal- ant(GERTV106/LoctiteRTV81585) to the male end of the elbow or pipe. High temperature silicone must also be used to re-seal any connections after maintenance to venting system.

NOTICE: Failure to follow these instructions will void the warranty.

INSTALLATION

PRECAUTIONS

Consult local building codes before beginning the installation. The installer must make sure to select the proper vent system for installa- tion. Before installing vent kit, the installer must read this fireplace manual and vent kit instructions.

Only a qualified service person should in- stall venting system. The installer must fol- low these safety rules:

Wear gloves and safety glasses for protection

Use extreme caution when using ladders or when on roof tops

Be aware of electrical wiring locations in walls and ceilings

The following actions will void the war- ranty on your venting system:

Installation of any damaged venting component

Unauthorized modification of the vent- ing system

Installation of any component part not manufactured or approved by DESA International

Installation other than as instructed by these instructions

WARNING: This gas fireplace and vent assembly must be vented directly to the outside. The venting system must NEVER be attached to a chimney serving a separate solid fuel burning ap- pliance. Each gas appliance must use a separate vent system. Do not use common vent systems.

WARNING: Horizontal sec- tions of this vent system require a minimum clearance of 2" from the top of the pipe and 1" minimum to the sides and bottom. 1 1/2" clear- ance is required where the termi- nation penetrates a combustible wall. Vertical sections of this sys- tem require a minimum of 1" clear- ance to combustible materials on all sides of the pipe.

INSTALLATION PLANNING

There are two basic types of direct-vent installation:

Horizontal Termination

Vertical Termination

It is important to select the proper length of vent pipe for the type of termination you choose. It is also important to note the wall thickness.

For Horizontal Termination: Select the amount of vertical rise desired. The horizon- tal run of venting must have 1/4" rise for every 12" of run towards the termination.

WARNING: Never run the vent downward as this may cause ex- cessive temperatures which could cause a fire.

You may use one or two 90° elbows in this vent configuration. See Horizontal Termina- tion Configurations on pages 10 and 11.

For Vertical Termination: Measure the dis- tance from the fireplace flue outlet to the ceiling. Add the ceiling thickness, the verti-

cal rise in an attic or second story, and allow for sufficient vent height above the roofline. You may use one or two 90° elbows in this vent configuration. See Vertical Termination Configurations on pages 13 and 14.

Note: You may use two 45° elbows in place of a 90° elbow. You must follow rise to run ratios when using 45° elbows.

For two-story applications, firestops are re- quired at each floor level. If an offset is needed in the attic, additional pipe and el- bows will be required.

You may use a chase with a vent termination with exposed pipe on the exterior of the house. See Installing Vent System in a Chase, below.

Your Vanguard direct-vent fireplace has been tested for a minimum 3' rise with a maximum 10" wall thickness. The maximum horizon- tal run is 20' with 8' vertical rise (seeInstal- lation for Horizontal Termination, page 8). The maximum vertical run is 30' (seeInstal- lation for Vertical Termination, page 12).

It is very important that the venting system maintain its balance between the combus- tion air intake and the flue gas exhaust. Certain limitations apply to vent configura- tions and must be strictly followed.

Installing Vent System in a Chase

A chase is a vertical boxlike structure built to enclose venting that runs along the out- side of a building. A chase is not required for such venting.

NOTICE: Treatment of firestops and construction of the chase may vary from building type to build- ing type. These instructions are not substitutes for the require- ments of local building codes. You must follow all local building codes.

Note: When installing in a chase, you should insulate the chase as you would the outside walls of your home. This is especially im- portant in cold climates. Minimum clear- ance between vent pipes and combustible materials such as insulation is 1".

After framing the chase (see Framing and Finishing on pages 4 and 5) install the vent system by following the installation in- structions.

Continued

106516

7

Image 7
Contents For Your Safety What to do if YOU Smell GAS For Your SafetyNatural GAS Model BHDV34NB PROPANE/LP GAS Model BHDV34PB Safety Information Glossary Terms Product FeaturesProduct Identification Local CodesFraming and Finishing PRE-INSTALLATION PreparationClearances Location and Space RequirementsLocation of Vent Termination General VentingGeneral Venting Installing Vent System in a Chase Venting InstallationInstallation Precautions Installation PlanningSnorkel Termination Installation for Horizontal TerminationVent Pipe Connections Horizontal Venting Horizontal Termination ConfigurationsVenting with Two 90 Elbows Flat Ceiling Installation Installation for Vertical TerminationCathedral Ceiling Installation Venting with One 90 Elbow Vertical Termination ConfigurationsVertical Venting Venting Check GAS Type Fireplace InstallationInstalling Optional Blower Accessory Installing GA3700/DA3610TA BlowersSide View Installation Items Needed Installing GAS Piping to Fireplace LocationPressure Testing Gas Supply Piping System Connecting Fireplace to GAS SupplyChecking GAS Connections Close equipment shutoff valve see Fig- ure Pressure Testing Fireplace Gas ConnectionsInstalling Optional Wall Mount Switch GWMS2 Installing Optional Wall Mounted Thermostat GWMT1Installing 9-Volt Battery in Hand- Held Remote Control Unit Installing 9-Volt Alkaline Battery into ReceiverREMOVING/REPLACING Glass Door Installing Left Side Brick Panel Installing Optional Brick Liner D8037AShown in Figure Installing LOGS, Lava Rock and Glowing EmbersOperating Fireplace Ghrc Series Operation Operating Optional Blower AccessoryGhrcta Series Operation Operating Optional GWMT1 Wall Mounted Thermostat Operating Optional GWMS2 Wall Mounted SwitchPilot Assembly Inspecting BurnersVenting System Cleaning and MaintenanceGlass Door Pilot and BurnersObserved Problem Possible Cause TroubleshootingObserved Problem Possible Cause Remedy Gas leak. See Warning statement Service Hints Replacement PartsWiring Diagram Technical ServiceBHDV34NB BHDV34PB SpecificationsAccessories Manual Blower KIT GA3700 Receiver and HAND-HELD Remote Control KIT Ghrc SeriesDuplex Outlet KIT Brass Louver KITBHDV34NB BHDV34PB33 Illustrated Parts BreakdownDIRECT-VENT Fireplace BHDV34NB BHDV34PB Parts ListWarranty Information