Desa CDCFTPA, CDCFTNA, CDCFPR installation manual Actual Framing Height, Front Width, Depth

Page 11

INSTALLATION

Continued

 

Actual

Framing

Height

26"

26 7/8"

Front Width

26 3/4"

26 7/8"

Depth

14 1/4"

15 1/4"

1.Frame in rough opening. Use dimensions shown in Figure 8 for the rough opening. If installing in a corner, use dimensions shown in Figure 10 for the rough opening. The height is 26 7/8" which is the same as the wall opening above.

2.If installing GA3450TA blower accessory, do so at this time. Follow instructions included with blower accessory.

Note: If not installing blower accessory, you may wish to run electrical wiring to your fireplace for future blower installation (see Accessories, page 44). Use only approved three-wire electrical wiring.

WARNING: If pre-wiring, do not connect wiring to any electri- cal source at this time.

Install fireplace electrical outlet and connect wiring to outlet before connecting to electrical source. The fireplace electri- cal outlet is included with the GA3450TA blower accessory.

Only use the fireplace electri- cal outlet supplied with the GA3450TA blower accessory.

15 1/4"

267/8"

267/8"

Figure 8 - Rough Opening for Installing

in Wall

435/16"

305/8"

267/8" 611/4"

Figure 9 - Rough Opening for Installing

in Corner

Note: A qualified installer should make all electri- cal connections.

3.Install gas piping to fireplace location. This installation includes an approved flexible gas line (if allowed by local codes) after the equip- ment shutoff valve. The flexible gas line must be the last item installed on the gas piping.

4.If you have not installed hood, follow instruc- tions on page 6.

5.Carefully set fireplace in front of rough opening with back of fireplace inside wall opening.

6.Attach flexible gas line to fireplace gas regula- tor. See Connecting Equipment Shutoff Valve to Heater Control, page 17.

7.Bend four nailing flanges on outer casing with pliers (see Figure 10).

8.Attach fireplace to wall studs using nails or wood screws through holes in nailing flange.

9.Check all gas connections for leaks. See Check- ing Gas Connections, page 17.

10.If using optional brass trim kit, install the trim after final finishing and/or painting of wall. See instructions included with brass trim ac- cessory for attaching brass trim.

IMPORTANT: When finishing your firebox, combus- tible materials such as wall board, gypsum board, sheet rock, drywall, plywood, etc. may be butted up next to the sides and top edge of the firebox. Combustible ma- terials should never overlap the firebox front facing.

WARNING: Do not allow any combustible/noncombustible materials to overlap the firebox front facing.

WARNING: Do not allow noncombustible materials to cover any necessary openings like louvered slots.

Wall Studs

Nails or Wood

Screws

Nailing Flanges

Figure 10 - Attaching Fireplace to Wall Studs

111244-01F

www.desatech.com

11

Image 11
Contents What to do if YOU Smell GAS Shown with Optional Cabinet Mantel/Hearth Base AccessoryTable of Contents Safety Information Product Identification Unpacking Optional Remote Control AccessoriesProduct Features Local CodesHex wrench Scissors Hood AssemblySheet Metal Screws Hood Louver Firebox Top Tools Required Phillips screwdriverDetermining FRESH-AIR Flow for Fireplace Location AIR for Combustion VentilationProviding Adequate Ventilation Ventilation Air From Outdoors Ventilation AIRVentilation Air From Inside Building Check GAS Type InstallationMinimum Clearance to Combustible Materials Installation ItemsBUILT-IN Fireplace Installation Fireplace ClearancesDepth If you have not installed hood, follow instruc- tions onActual Framing Height Front WidthMantel Shelf Optional Mantel InstallationMantel Clearances for Built-In Installation Installing Optional Blower Accessory GA3450TA Cord Installing Blower AccessorySwitch Plate Wire Remote Blower Harness Bracket Switch PlateLower louver For Built-In InstallationTest to make sure blower is working properly Connecting to GAS Supply Checking GAS Connections Connecting Equipment Shutoff Valve to Heater ControlInstallation Items Needed Gas Meter Correct all leaks at onceEquipment Open Shutoff Valve Closed Gas Regulator or Equipment Gas Control ValveOptional Wall Mounted Optional Wireless HAND-HELD Remote Control AccessoriesInstalling Receiver Installing 9-Volt Battery in Hand-Held Remote Control UnitTerminal W Terminal R R Feed wires through rectangular slotsRemove jumper wire from control valve see , Log Set Log Shoulder Screw Brick Liner Bracket ScreenRear Brick Liner Left Brick LinerIgnitor Button Control Knob For Your Safety Read Before LightingOperating Fireplace Lighting InstructionsOperating Blower Manual Lighting ProcedureTo Turn OFF GAS To Appliance Thermostat Control OperationPiezo Flame Control Ignitor Adjustment Knob Button REMOTE-READY Models For Your Safety Read Before LightingAUTO/OFF/ON Switch Pilot Burner Ignitor Electrode If Using Optional Hand-Held RemoteOptional HAND-HELD Remote Operation Pilot Ignitor Burner ElectrodeThermostat Series Model HRC200 Series Manual ModeAuto Thermostatic Mode ON/OFF Series Model HRC100Pilot Flame Pattern Optional GWMS2 Wall Mounted SwitchInspecting Burners Optional GWMT1 Wall Mounted ThermostatIf pilot flame pattern is incorrect, as shown in , Cleaning MaintenanceBurner Flame Pattern Burner Injector Holder and Pilot AIR Inlet HoleRemote-Ready Models Only Wiring DiagramLOG SET CabinetIgnitor cable dry TroubleshootingObserved Problem Possible Cause Remedy Ignitor cable pinched or wetOr replace burner orifice Burner orifice is cloggedMote-Ready Models Only Models OnlySlight smoke or odor during When heated, vapors fromWalls or furniture Cleaners, etc. may turn into Mote-Ready Models Only Power is lowMent above Gas odor even when controlFireplace produces unwanted Ers, chemicals, new carpetThermostat Models SpecificationsDimensions H x W x D including hood Parts Under Warranty Replacement PartsService Hints Technical ServiceIllustrated Parts Breakdown Parts List Cdcfpr 104281-02BR Firebox Hood Firebox Top Firebox Models Cdcfnr and CdcfprOuter Casing Illustrated Parts Breakdown Lighting Instruction Plate Not a field replaceable part Brass Flare Adapter FittingHardware Pack FDCFTN/TP VDCFRN/RP CDCFNR/PR Lighting Instruction Plate Brass Trim KIT GA6095 AccessoriesTHERMOSTAT-CONTROLLED Blower KIT GA3450TA Equipment Shutoff Valve GA5010Information Video WALL-MOUNT Thermostat Switch GWMT1WALL-MOUNT ON/OFF Switch GWMS2 Receiver and HAND-HELD Remote Control KIT HRC100 Series111244-01F 111244-01F 111244-01

CDCFTNA, CDCFPR, CDCFTPA specifications

Desa CDCFTPA, CDCFPR, and CDCFTNA represent a suite of advanced technologies and methodologies employed in the development and management of efficient distribution networks within the field of telecommunications and data services. These frameworks are designed to enhance connectivity, streamline processes, and ensure optimal performance in various environments.

One main feature of Desa CDCFTPA (Coaxial Digital Channel Fiber Transmission Protocol Architecture) is its ability to integrate coaxial cables with fiber optic technology, enabling high-speed data transmission over existing infrastructures. This hybrid approach not only reduces the need for extensive renovations but also capitalizes on the advantages of both technologies, offering broadband accessibility and improved bandwidth capabilities. By leveraging both mediums, operators can deliver enhanced services while maintaining cost-efficiency.

CDCFPR (Centralized Data Control Fiber Processing Resource) represents a centralized approach to managing data flow within telecommunications networks. Its core characteristic lies in its architecture, which supports dynamic allocation of resources in real-time. This enables network operators to efficiently allocate bandwidth based on demand, optimize routing paths, and reduce latency. Additionally, CDCFPR employs advanced algorithms for data compression and encryption, ensuring that users experience a seamless and secure connection.

CDCFTNA (Carrier Digital Channel Fiber Transmission Network Architecture) is focused on creating robust networks that can support a variety of distribution channels, including 5G and IoT devices. Its design emphasizes scalability and adaptability, allowing network providers to easily expand or modify their infrastructure to meet evolving market needs. Key technologies incorporated in CDCFTNA include Software-Defined Networking (SDN) and Network Function Virtualization (NFV), which enable operators to manage their resources more flexibly and efficiently.

Each of these frameworks boasts unique characteristics that contribute to the overall enhancement of telecommunications systems. They embody a commitment to innovation, sustainability, and user-centric design, aligning with current trends in digital services and communication technologies. By deploying such advanced systems, service providers can ensure they remain competitive in a fast-paced and continuously evolving market. In summary, Desa CDCFTPA, CDCFPR, and CDCFTNA collectively represent the future of telecommunications infrastructure, promising improved connectivity, efficiency, and adaptability for a diverse range of applications.