Desa BDV34N(A) installation manual Vent Pipe Connections

Page 9

OWNER’S MANUAL

VENTING INSTALLATION

Continued

3.Attach vent pipe assembly to the fire- place. Set fireplace in front of it’s per- manent location to insure minimum clearances. Mark the wall for a 10" square hole (for noncombustible ma- terial such as masonry block or con- crete, a 7 1/2" diameter hole is accept- able). See Figure 12. The center of the hole should line up with the center- line of the horizontal rigid vent pipe. Cut a 10"x10" (254mm x 254mm) square hole through combustible ex- terior wall (7 1/2" [190mm] diameter hole if noncombustible). Frame as nec- essary (see Figure 12).

 

4" Clamp

Female

7" Clamp

Locking

 

Lugs

 

 

Spacer

 

Spring

Male

4" Flex

Pipe

Slots

 

 

7" Flex

 

Pipe

Rigid Vent Pipe Flexible Vent Pipe

Figure 11 - Vent Pipe Connections

Vent Opening

Combustible Wall

10"

(254mm)

10"

(254mm)

(Framing

4.Apply a bead of non-hardening mastic around the outside edge of the vent cap. Position the vent cap in the center of the 7 1/2" or 10" hole on the exterior wall with the arrow on the vent cap pointing up. Insure proper clearance of 1" to combustibles is maintained. At- tach the vent cap with four wood screws supplied (see Figure 13). Note: Re- place the wood screws with appropri- ate fasteners for stucco, brick, concrete, or other types of siding.

WARNING: Do not recess vent termination in to any wall. This will cause a fire hazard.

For vinyl siding, stucco, or wood exte- rior use vinyl siding standoffs between vent cap and exterior wall. The vinyl sid- ing standoff prevents excessive heat from melting the vinyl siding material. Bolt the vent cap to the standoff. Apply non-hard- ening mastic around outside edge of the standoff instead of the vent cap assem- bly. Use wood screws provided to attach the standoff. See Figure 14.

5.Slide the wall thimble over the vent pipe before connecting the horizontal run to the vent cap (see Figure 15).

Apply Mastic to All Four Sides

UP

Wood

Screw

Vent Cap

Figure 13 - Installing Horizontal Vent Cap

6.Carefully move the fireplace with vent assembly attached toward the wall and insert the vent pipe into the horizontal termination. The pipe overlap should be a minimum of 1 1/4". Apply silicone to the connection. Fasten all vent con- nections with screws provided. Refer to Fireplace Installation on page 16 for instructions on securing unit to fram- ing or floor.

7.Slide the wall thimble against the inte- rior wall surface and attach with screws provided (see Figure 15).

Cut Vinyl Siding

Away to Fit

Standoff

Wood Screw

Standoff

UP

Nut

Bolt

Apply Mastic

to All Four Sides Vent Cap

Figure 14 - Installing Vinyl Siding Standoff

Interior Wall

Surface

Wall

Thimble

Vent Cap

Vent Opening

Detail)

(Horizontal

Screw

 

Noncombustible Wall

7 1/2" (190mm)

Figure 12 - Vent Opening Requirements

Termination)

Horizontal

 

Vent Pipe

Figure 15 - Connecting Vent Cap with Horizontal Vent Pipe

Continued

105453

9

Image 9
Contents For Your Safety For Your Safety What to do if YOU Smell GASBDV34NA and BDV34PA DIRECT-VENT Fireplace NATURAL/PROPANE Safety InformationProduct Identification Product FeaturesLocal Codes Glossary TermsClearances PRE-INSTALLATION PreparationLocation and Space Requirements Framing and FinishingLocation of Vent Termination General Venting General Venting Installation Precautions Venting InstallationInstallation Planning Installing Vent System in a ChaseSnorkel Termination Installation for Horizontal TerminationVent Pipe Connections Horizontal Venting Horizontal Termination ConfigurationsVenting with Two 90 Elbows Installation for Vertical Termination Flat Ceiling InstallationCathedral Ceiling Installation Venting with One 90 Elbow Vertical Termination ConfigurationsVertical Venting Vertical Rigid Venting Configuration Using Two 90 ElbowsParts Lists for Venting Kits and Components High Altitude InstallationVanguard Rigid Venting Vanguard Flexible VentingInstalling Optional Blower Accessory Fireplace InstallationInstalling GA3700/DA3610T Blowers Check GAS TypeSide View As a freestanding unit with an acInstallation Items Needed Installing GAS Piping to Fireplace LocationPressure Testing Gas Supply Piping System Connecting Fireplace to GAS SupplyChecking GAS Connections Test Pressures In Excess Of 1/2 Psig 3.5 kPaInstalling Optional Wall Mount Switch GWMS2 Pressure Testing Fireplace Gas ConnectionsTest Pressures Equal To or Less Than 1/2 Psig 3.5 kPa Installing Remote Receiver Installing 9-Volt Battery in Hand- Held Remote Control UnitREMOVING/REPLACING Glass Door Installing Left Side Brick Panel Installing Optional Brick Liner D8037Fireplace Models BDV34NA and BDV34PA Installing LOGS, Lava Rock and Glowing EmbersManual Lighting Procedure For Your Safety Read Before LightingOperating Fireplace Lighting InstructionsPilot Assembly Operating Optional Blower AccessoryInspecting Burners Optional Remote OperationCleaning and Maintenance Observed Problem Possible Cause TroubleshootingObserved Problem Possible Cause Remedy Above Gas leak. See Warning statementTechnical Service Replacement Wiring Diagram PartsService Hints Parts Under WarrantyBDV34NA BDV34PA SpecificationsAccessories ON/OFF Wall Mount Switch GWMS2 Receiver and HAND-HELD Remote Control KIT Ghrc SeriesDuplex Outlet KIT GA3555 not Shown Brass Louver KITIllustrated PARTS37 Breakdown DIRECT-VENT Fireplace BDV34NA Parts ListBDV34PA7 DIRECT-VENT Fireplace BDV34PA Warranty Information