Hearth and Home Technologies Montana-42, Montana-36 Install the Termination Cap

Page 15

MONTANA INSTALLATION INSTRUCTIONS

9.Install the Termination Cap

If a roof flashing is to be used, install the roof flashing appropriate to the roof pitch and install a round termination cap following the instructions shipped with the cap.

For chase installations you can use a round termination cap (TR11), a round telescoping termination cap (TR11T) or a square termination cap (ST1175). A chase installation must use a chase top. Chase tops are available from your Heat-N-Glo distributor.

a.Install the chimney sections up through the chase enclosure. When using a TR11 round termination cap, the uppermost top section of pipe must extend 6” above the top of the chase collar to allow installation of the storm collar and termination cap. See Figure 14.

b.For installations utilizing a TR11T telescoping round termination cap, the uppermost chimney section must be below the top of the chase top, but not more than 14½” below the top of the chase top flashing collar. See Figure 15.

c.For installations utilizing an ST1175 square termination cap the last chimney section must not be more than 4½” below the chase top. See Figure 16.

d.Attach the chase top to the top of the chase.

e.Install the termination cap, following the instructions provided with it.

Figure 15 - Installing a TR11T Round Telescoping

Termination Cap

Figure 14 - Installing a TR11 Round Termination Cap

Figure 16

Installing an ST1175 Square Termination Cap

01/04

4039-150 Rev B

15

Image 15
Contents MONTANA-36 and MONTANA-42 Outdoor Woodburning Fireplace Installation & Operating InstructionsTable of Contents Optional Components Include Listings and Code ApprovalsDescription of the Fireplace System Heat-N-Glo fireplace system consists of the followingFireplace Components Fireplace System ComponentsCatalog # Description Chimney ComponentsFirestop Spacer TR11T Fireplace Locations and Space Requirements PRE-INSTALLATION PreparationConstruct an Outdoor Enclosure Frame the FireplaceSidewalls/Surrounds Chimney Requirements Using Offsets and ReturnsNumber of Sections Required Chimney Height Requirements above roof lineLevel the Fireplace Installation of the FireplacePosition the Fireplace Place the Protective Metal Hearth StripsAssemble Chimney Sections Install Firestop SpacersDouble-check the Chimney Assembly ∅ 6. Attic Insulation ShieldSecure the Chimney System Installing a TR11T Round Telescoping Termination Cap Install the Termination CapInstall the Chimney Air Kit Install the Cooling Air Kit furnishedGas Log/Lighter Provisions Complete the EnclosureFactory Built Hearth Extension Hearth ExtensionGlass Doors Position the Hearth ExtensionFinishing Material MantelMontana Installation Instructions General Information Flue Damper Operating InstructionsFirescreen GrateWood Fuel Starting a Fire Creosote and Soot Maintenance InstructionsChimney Cleaning Disposal of AshesHomeowner’s Notes Index Warranty For HEAT-N-GLO Fireplaces