Teledyne 3300ZB operating instructions Installation, Unpacking the Analyzer

Page 19

Trace Oxygen Analyzer

Installation

 

 

 

Installation

Installation of the analyzer includes:

1.Unpacking the system.

2.Mounting the control unit to a wall.

3.Making the electrical connections.

4.Making the gas connections.

5.Testing the installation.

CAUTION: READ THIS CHAPTER IN ITS ENTIRETY BEFORE INSTALLING THE UNITS.

THE MODEL 3300ZB IS FOR INDOOR USE ONLY.

THE SAMPLE MUST BE FREE OF ENTRAINED SOLIDS, WATER, OR COMBUSTIBLE COMPOUNDS.

3.1 Unpacking the Analyzer

As soon as you receive the instrument, carefully unpack and inspect control unit, external probe, and any included accessories for damage. Immediately report any damage to the shipping agent. The analyzer is shipped with all materials needed to install and prepare the system for operation.

Teledyne Analytical Instruments

9

Image 19
Contents Model 3300ZB Model 3300ZB Safety Messages Model 3300ZB Table of Contents Maintenance Front Panel List of FiguresCombustible GAS Usage This page intentionally left blank Page Introduction Main Features of the AnalyzerOverview Front Panel Front Panel Description∙ Measurement Parameters Readout Rear Panel Description Power Connection Principles of Operation Operational TheoryIntroduction Zirconium Oxide SensorsEffect of Pressure ElectronicsGeneral Block Diagram of the Signal Processing Electronics Signal ProcessingOperational Theory Model 3300ZB Unpacking the Analyzer InstallationLocation and Mounting Control Unit InstallationElectrical Connections Rear Panel Electrical Connectors Contact ID for Failsafe Relay Operation Gas Connections Piping Diagram Installation ChecklistOperation Front Panel Controls and IndicatorsSetting the Analysis Ranges Using the Function and Data Entry ButtonsHI Range Setting the Alarm SetpointsHI Alarm LO AlarmSelecting a Fixed Range or Autoranging Sensor Fail AlarmCalibration LED Display on StartUp This page intentionally left blank Replacing the Fuse MaintenanceWhen to Replace a Sensor Sensor Installation or ReplacementZrO2 Sensor and Cell Block This page intentionally left blank Appendix SpecificationsTeledyne Analytical Instruments Spare Parts ListDrawing List