Installation | Model 3300ZB | |
|
|
|
Figure 3-3: Piping Diagram
3.5 Installation Checklist
Before connecting the instrument to a power source and applying power, make sure you have:
∙Correctly installed the sample and exhaust gas lines
∙Checked for leaks
∙Set the sample pressure to
Once the above checks have been made, you can apply power. The instrument is now ready for operation.
Teledyne Analytical Instruments | 14 |