3.5 Installation Checklist

Before connecting the instrument to a power source and applying power, make sure you have:

Correctly installed the sample and exhaust gas lines

Checked for leaks

Set the sample pressure to 5-10 psig nominal

Once the above checks have been made, you can apply power. The instrument is now ready for operation.

Teledyne Analytical Instruments

14

Image 24
Contents Model 3300ZB Model 3300ZB Safety Messages Model 3300ZB Table of Contents Maintenance List of Figures Front PanelCombustible GAS Usage This page intentionally left blank Page Main Features of the Analyzer IntroductionOverview Front Panel Description Front PanelRear Panel Description ∙ Measurement Parameters Readout Power Connection Operational Theory IntroductionZirconium Oxide Sensors Principles of OperationElectronics Effect of PressureGeneral Signal Processing Block Diagram of the Signal Processing ElectronicsOperational Theory Model 3300ZB Installation Unpacking the AnalyzerControl Unit Installation Location and MountingElectrical Connections Rear Panel Electrical Connectors Contact ID for Failsafe Relay Operation Gas Connections Installation Checklist Piping DiagramFront Panel Controls and Indicators OperationUsing the Function and Data Entry Buttons Setting the Analysis RangesSetting the Alarm Setpoints HI AlarmLO Alarm HI RangeSensor Fail Alarm Selecting a Fixed Range or AutorangingCalibration LED Display on StartUp This page intentionally left blank Maintenance Replacing the FuseSensor Installation or Replacement When to Replace a SensorZrO2 Sensor and Cell Block This page intentionally left blank Specifications AppendixSpare Parts List Teledyne Analytical InstrumentsDrawing List