Teledyne 3300ZB Location and Mounting, Electrical Connections, Control Unit Installation

Page 20

Installation

Model 3300ZB

 

 

 

3.2 Location and Mounting

3.2.1 Control Unit Installation

The 3300ZB control unit is designed to be wall-mounted in a general purpose, indoor area, away from moisture and the elements. The unit should be installed at viewing level in a sheltered area.

CAUTION: FOR THE DC POWERED VERSION, THE CONTROL UNIT CHASSIS MUST BE ISOLATED FROM THE INPUT POWER GROUND.

Refer to the Outline Diagram for the physical dimensions of the analyzer, which can be found at the back of the manual.

3.3 Electrical Connections

Figure 3-1 shows the Model 3300ZB rear panel.

Primary Input Power: The power cord receptacle, fuse block and power switch are located in the same assembly. A 6-foot standard AC power cord is supplied with the control unit. Insert the female plug end of the power cord into the power cord receptacle.

The universal power supply allows direct connection to any 100- 240VAC, 50/60 Hz power source. The fuse block, to the right of the power cord receptacle, accepts a 5 × 20 mm, 0.5A time-delay fuse (see Fuse Replacement in Chapter 5 - Maintenance).

The power switch is located on the right-hand end of the power source input receptacle assembly.

Teledyne Analytical Instruments

10

Image 20
Contents Model 3300ZB Model 3300ZB Safety Messages Model 3300ZB Table of Contents Maintenance List of Figures Front PanelCombustible GAS Usage This page intentionally left blank Page Overview Main Features of the AnalyzerIntroduction Front Panel Description Front PanelRear Panel Description ∙ Measurement Parameters Readout Power Connection Operational Theory IntroductionZirconium Oxide Sensors Principles of OperationGeneral ElectronicsEffect of Pressure Signal Processing Block Diagram of the Signal Processing ElectronicsOperational Theory Model 3300ZB Installation Unpacking the AnalyzerElectrical Connections Control Unit InstallationLocation and Mounting Rear Panel Electrical Connectors Contact ID for Failsafe Relay Operation Gas Connections Installation Checklist Piping DiagramFront Panel Controls and Indicators OperationUsing the Function and Data Entry Buttons Setting the Analysis RangesSetting the Alarm Setpoints HI AlarmLO Alarm HI RangeCalibration Sensor Fail AlarmSelecting a Fixed Range or Autoranging LED Display on StartUp This page intentionally left blank Maintenance Replacing the FuseSensor Installation or Replacement When to Replace a SensorZrO2 Sensor and Cell Block This page intentionally left blank Specifications AppendixSpare Parts List Teledyne Analytical InstrumentsDrawing List