8.For wire stripping and connection requirement, refer to the diagram below.
9.Secure the power supply cord and connecting cables onto the control board with the holder.
10.Attach the control board cover (metal and resin) and valve cover back to the original position with screw.
10.6 HEAT INSULATION
|
| Use a material with good |
| |
CAUTION |
| the pipes. Be sure to insulate both the |
|
|
pipes are not adequately insulated, condensation or water leakages may |
| |||
| occur. |
| ||
|
|
|
|
|
Cutting and Flaring the Piping
1Please cut using pipe cutter and then remove the burrs.
2Remove the burrs by using reamer. If burrs is not removed, gas leakage may be caused. Turn the piping end down to avoid the metal powder entering the pipe.
3Please make flare after inserting the flare nut onto the copper pipes.
Material shall
withstand 248°F or
higher
19