Patton electronic 4940 manual Installing the gateway

Page 24

SmartNode 4940 Getting Started Guide

3 • SmartNode installation

 

 

IP addresses of central H.323 gatekeeper (if used)

IP addresses and/or URL of SIP servers or Internet telephony services (if used)

Login and password for SIP or H.323 based telephony services

IP addresses of central TFTP server used for configuration upload and download (optional)

Software tools

You will need a PC (or equivalent) with Windows Telnet or a program such as Tera Term Pro Web (included on the SmartNode CD-ROM) to configure the software on your SmartNode router.

AC Power Mains

If you suspect that your AC power is not reliable, for example if room lights flicker often or there is machinery with large motors nearby, have a qualified professional test the power. Patton recommends that you include an uninterruptible power supply (UPS) in the installation to ensure that VoIP service is not impaired if the power fails. Refer to “Connecting the power supply” on page 26.

Location and mounting requirements

The SmartNode router is intended to be placed on a desktop or similar sturdy, flat surface that offers easy access to the cables. Allow sufficient space at the rear of the chassis for cable connections. Additionally, you should consider the need to access the unit for future upgrades and maintenance.

Note Under the rack mount option, the chassis can be equipped with rack mount ears that allow for use in a 19” rack.

Installing the gateway

SmartNode hardware installation consists of the following:

Placing the device at the desired installation location (see section “Placing the SmartNode” on page 24)

Connecting the interface and power cables (see section “Installing cables”)

When you finish installing the SmartNode, go to chapter 4, “Initial configuration” on page 27.

Placing the SmartNode

Place the unit on a desktop or similar sturdy, flat surface that offers easy access to the cables. The unit should be installed in a dry environment with sufficient space to allow air circulation for cooling.

Note For proper ventilation, leave at least 2 inches (5 cm) to the left, right, front, and rear of the unit.

Installing cables

Do not work on the system or connect or disconnect cables during periods of lightning activity.

WARNING

Installing the gateway

24

Image 24
Contents SmartNode 4940 Series Mailsupport@patton.com Summary Table of Contents Table of Contents Contacting Patton for assistance Cabling List of Figures List of Tables About this guide AudienceStructure Precautions Impaired functioningSafety when working with electricity Typographical conventions used in this document General observationsGeneral conventions Chapter contents General informationSmartNode 4940 overview SmartNodeSN4940 model codes SN4941 model codesSmartNode 4940 rear panel SmartNode 4940 rear panel ports are described in tableDC power input SmartNode 4940 front panel SN4940/4E120VLED Applications overview Introduction Application-Convert Legacy PBX to VoIPSmartNode installation Planning the installation Network DiagramSite log Network informationInstalling the gateway Connecting the PRI Connecting the power supply Initial configuration Configuring the desired IP address Connecting the SmartNode to the networkFactory-default IP settings Loading the configuration optional Connecting the SmartNode to the networkBootloader Start BootloaderStart-up with factory configuration Load a new application image SmartWare via TftpCopy tftp//tftpserveraddress/server path/b1 flash Additional information Load a new application image SmartWare via the serial linkContacting Patton for assistance Warranty coverage Contact informationPatton support headquarters in the USA Out-of-warranty service RMA numbersAppendix a Compliance information Safety ComplianceRadio and TV Interference Pstn RegulatoryFCC Part 68 Acta Statement Industry Canada NoticeCE Declaration of Conformity Authorized European RepresentativeAppendix B Specifications Voice processing signalling dependent Voice connectivityData connectivity Fax and modem supportVoice signalling IP servicesVoice routing-session router Management SystemPhysical Identification of the SmartNode devices via Snmp SmartNode Model SysObjectIDSmartNode Model SysObjectID Appendix C Cabling Connecting a serial terminal ConsoleEthernet E1 PRI T1 PRI Appendix D Port pin-outs Pin Signal Console portPRI port Appendix E SmartNode 4940 factory configuration Introduction Appendix F End user license agreement End User License Agreement Termination Other licenses