Heat Controller RAD-81A, RAD-101A, RADS-81B manual Evaporator, Capillary Tube

Page 22

Disassembly

2. EVAPORATOR

1.Remove the cabinet.

2.Remove the 2 screws which fasten the evaporator.

3.Move the evaporator sideways carefully.

4.After discharging the refrigerant completely, unbraze the interconnecting tube at the evaporator connections.

5.Remove the evaporator carefully.

6.Re-install the component by referring to notes. (See Figure 32)

3.CAPILLARY TUBE

1.Remove the cabinet.

2.After discharging the refrigerant completely, unbraze the interconnecting tube at the capillary tube.

3.Remove the capillary tube.

4.Re-install the component by referring to notes.

NOTICE

Replacement of the refrigeration cycle.

1.When replacing the refrigeration cycle, be sure to Discharge the refrigerant system using a FreonTM recovery System.

If there is no valve to attach the recovery system, install one (such as a WATCO A-1) before venting the FreonTM. Leave the valve in place after servicing the system.

2.After discharging the unit completely, remove the desired component, and unbraze the pinch-off tubes.

3.Solder service valves into the pinch-off tube ports, leaving the valves open.

4.Solder the pinch-off tubes with Service valves.

5.Evacuate as follows.

1)Connect the vacuum pump, as illustrated figure 33A.

2)Start the vacuum pump, slowly open manifold valves A and B with two full turns counterclock- wise and leave the valves open.

The vacuum pump is now pulling through valves A and B up to valve C by means of the manifold and entire system.

CAUTION: If high vacuum equip- ment is used, just crack valves A

and B for a few minutes, then open slowly with the two full turns counter- clockwise. This will keep oil from foaming and being drawn into the vacuum pump.

3)Operate the vacuum pump vaccum for 20 to 30 minutes, until 600 microns of vaccum is obtained. Close valves A and B, and observe vacuum gauge for a few minutes. A rise in pres- sure would indicate a possible leak or moisture

Figure 32

remaining in the system. With valves A and B closed, stop the vacuum pump.

4)Remove the hose from the vacuum pump and place it on the charging cylinder. See figure 37B. Open valve C.

Discharge the line at the manifold connection.

5)The system is now ready for final charging.

6.Recharge as follows :

1)Refrigeration cycle systems are charged from the High-side. If the total charge cannot be put in the High-side, the balance will be put in the suction line through the access valve which you installed as the system was opened.

2)Connect the charging cylinder as shown in figure 33B.

With valve C open, discharge the hose at the manifold connection.

3)Open valve A and allow the proper charge to enter the system. Valve B is still closed.

4)If more charge is required, the high-side will not take it. Close valve A.

5)With the unit running, open valve B and add the balance of the charge.

a.Do not add the liquid refrigerant to the Low-side.

b.Watch the Low-side gauge; allow pressure to rise to 30 lbs.

c.Turn off valve B and allow pressure to drop.

d.Repeat steps b. and c. until the balance of the charge is in the system.

6)When satisfied the unit is operating correctly, use the pinch-off tool with the unit still running and clamp on to the pinch-off tube. Using a tube cutter, cut the pinch-off tube about 2 inches from the pinch-off tool. Use sil-fos braze and braze pinch-off tube closed. Turn off the unit, allow it to set for a while, and then test the leakage of the pinch-off connection.

22Room Air Conditioner

Image 22
Contents +$7&21752//5,1& Table of Contents Always install the expansion panels Safety PrecautionsDo not disassemble or modify products Ventilate before operating air conditionerwhen gas goes out Plug in the power plug properlyDo not modify power cord length Do not use the socket if it is loose or damagedDo not clean the air conditioner with water Symbols Used in this Manual DimensionsOutside Dimensions Product Specifications ItemsRAD 81A Rads 81B How to Secure the Drain Pipe InstallationInstallation Check Select the Best LocationHow to Install Window RequirementsCabinet Installation Preparation of ChassisIndoor Outdoor Window Locking Bracket For Normal Cooling OperationLocation and Function of Controls For Maximum CoolingRemote Control Operations Front Grille DisassemblyMechanical Parts CabinetAIR Guide and Blower Air Handling PartsFAN and Shroud Overload Protector Electrical PartsMotor CompressorModel Touch & Remote Control Type Model Capacitor Model Rotary Switch Type ModelThermostat Model Rotary Switch Type Model Refrigerating Cycle Rotary Switch Model Rotary Switch Type ModelPower Cord CondenserEvaporator Capillary TubePulling Vacuum Schematic Diagram Wiring DiagramCircuit Diagram Electronic Control Device Components LocationFor Main P.W.B ASM Troubleshooting Guide Piping SystemTroubleshooting Guide Unit runs but poor coolingFails to Start Model BG8000ER, WG8000RY4, WG1000RY4 Electric Parts Troubleshooting GuidePossible Trouble Set the Temp. setting to lower Temp Is the voltage No.16 Room AIR Conditioner Voltage Limits Troubleshooting Guide Troubleshooting Guide Exploded Vie w W0CZZReplacement Parts List +$7&21752//5,1&