Heat Controller BG-103A service manual Pulling Vacuum

Page 11

Equipment needed: Vacuum pump, Charging cylinder, Manifold gauge, Brazing equipment. Pinch-off tool capable of making a vapor-proof seal, Leak detector, Tubing cutter, Hand Tools to remove components, Service valve.

CONDENSER

COMPOUND GAUGE

 

 

 

 

(HIGH PRESSURE SIDE)

MANIFOLD

 

 

 

 

 

GAUGE

A

 

 

B

CAPILLARY TUBE

 

 

 

 

 

SEE INSETS

 

 

 

BELOW

 

 

 

EVAPORATOR

 

 

 

(LOW PRESSURE SIDE)

 

COMPRESSOR

 

 

 

 

LOW

HI

 

A

 

 

 

B

B

A

 

EXTERNAL

 

 

 

VACUUM PUMP

 

 

 

 

 

CHARGING

 

 

 

CYLINDER

 

 

 

C

 

Figure 17A-Pulling Vacuum

Figure 17B-Charging

 

—11

 

 

 

Image 11
Contents Heat CONTROLLER, INC Contents Remark Specifications 1.3.1 for BG-103AVentilation FeaturesControl Locations Cooling only Model OperationControl BOX Mechanical PartsFront Grille CabinetORIFICE, and Turbo FAN AIR Handling PartsCapacitor Electrical PartsCompressor Thermistor Power CordCapillary Tube Refrigeration CycleCondenser EvaporatorPage Pulling Vacuum Required Tools Installation RequirementsInstallation Hardware Electrical ServiceItems in Installation Hardware HOW to InstallToassembletrim,tpthetabofeachpiece Procedure aTop View Procedure BWall Wall sleeve inches Procedure CParts and Installation Piping System Outside DimensionsTroubleshooting Guide Fails to Start Complaint Cause Remedy Name Plate Rating Minimum Maximum Room AIR Conditioner Voltage LimitsComplaint Cause Remedy Circuit Diagram Exploded View Description QTY Remark Replacement Parts ListHeat CONTROLLER, INC