Installation procedure
1. Before installation
[Before finishing installation, do not throw the attached installation parts away.]
Confirm the route to carry the units to the installation place.
Do not remove the package of the unit, before carrying it to the installation place.
When have to remove the package, use a soft material or protection board with rope to lift the unit to prevent the unit from damage or bumping scrape.
2. Selection of installation place
Select the firm place that will not influenced by vibration and can bear the weight of the unit Select the place with easy drainage and place can perform outdoor unit pipe connecting. Select the place far away from heat source, vapor source and direct sunshine to avoid the causing of the trouble in operation parts and the deformation of the casing.
Select the place where the cool air or warm air can evenly spread to every corner of the room. Select the place near power receptacle leaving sufficient space around the unit. (Referring to installation diagram)
Avoid the following installation places
Place with oil fog splash and much vapor (e.g. mechanical plant and kitchen, etc.) to prevent heat exchanger from performance lowering and plastic parts from corroding to damage.
Place may generate or keep corrosive gas (sulfur dioxide, etc.), flammable gas (diluent, gasoline, etc.) to prevent heat exchanger from corroding, plastic parts from damage and flammable gas from causing fire accident.
Hospital, etc. places near the machine generates electromagnetic wave or high frequency signal to prevent the mixed wave from causing wrong action of the control parts.
Place can be blown by the sea wind (coastal area) to prevent the casing and heat exchanger from corroding.
3. Installation space
(Indoor unit) please keep the spaces larger than the following dimension.
50
Unit (mm)
1000
50
600
600
600
50
15