Oregon 613GC manual Guide BAR and Diamond Chain Installation

Page 9

613GC OPERATOR’S MANUAL

SET-UP

GUIDE BAR AND DIAMOND CHAIN INSTALLATION

STEP 1

Loosen side cover nuts and remove side cover.

STEP 4

Mount the diamond chain on the guide bar starting at the drive sprocket & continue over the guide bar nose.

Install the diamond chain correctly. The bumper must always lead the segment into the cut as shown here.

STEP 2

Place bar onto studs and chain adjustment pin.

STEP 3

Move chain adjuster pin back towards drive sprocket by turning chain-tensioning screw counter clockwise.

9

STEP 5

Make sure all the drive links are inside the guide bar groove then pre-tension the chain.

Image 9
Contents CUT-OFF SAW 613GC OPERATOR’S Manual 613GC OPERATOR’S Manual Symbols & Labels Following Symbol Applies to ALL the Items Listed on this General Safety Precautions Following Symbol Applies to ALL Items Listed on thisEngine BREAK-IN Technical Specifications Guide BAR and Diamond Chain Installation SET-UP Fuel Handling Fuel MixingFueling Starting and Stopping a CHAIN-BASED CUT OFF SAW Cold Engine Starting ProcedurePlanning the CUT PRE-CUT ChecklistCutting Tips Cutting with the 613GC CUT-OFF SAWSystem CLEAN-UP After Each USE After 10 Hours of USEAfter 40 Hours of USE Starter Housing Assembly Starter Cord ReplacementAIR Filter Tensioning the Recoil Spring Drive Sprocket Chain TensionerDrive Sprocket Installation Drive Sprocket RemovalSpark Plug Carburetor Guide Bars Further questions? Call 1-800-321-1240 or 613GC OPERATOR’S Manual Approximate Cutting RatesINCH-FOOT Definition 613GC OPERATOR’S Manual 613GC OPERATOR’S Manual