Emerson MRLDS operation manual

Page 4
Image 4
Contents Rev 1 Page FCC Compliance Notice Page Table Of Contents Page Powering The Mrlds SpecificationsMrlds Models Choosing a Mounting Location Mounting The SensorMrlds Wiring Mrlds DimensionsNetwork Layout Refrigerant Jumper Settings Controller Setup For Analog Mrlds1 E2 Controllers Version 2.5 and Newer Refrigerant Type J2J1Mrlds Setup Mrlds WiringRmcc Controllers Mrlds Network AddressingAddress Settings Refrigerant Jumper SettingsModbus Address J5J4J3 Jumper Settings Mrlds TerminationMrlds Gateway Setup on I/O Network Mrlds GatewayGateway Connections Gateway BoardPowering the Gateway Board Wire ConnectionsInput Voltage Three-Board Six-BoardTermination Settings Gateway Board I/O Net AddressingSetting the Baud Rate Dip Switches Mrlds SetupHand-Held Terminal Set Tings Select ScreenController Setup for Modbus Mrlds Gateway TroubleshootingMapping The Mrlds as an Irlds Application Designating Mrlds as a 16AI BoardReflecs Setup for Irlds IIs 3 E2/Einstein ControllersRmcc Controllers Version 2.1 and Newer Press 2 to Set Device #’sInput Definitions Sensor SetupSensor Setpoints E2 Alarming Irlds Mode2 16AI Mode Alarm Setpoints