Sterling A0544325 installation manual Event of Shipping Damages, If the Shipment is Not Complete

Page 9

1-6 In the Event of Shipping Damages

Important!

According to the contract terms and conditions of the Carrier,

the responsibility of the Shipper ends at the time and place of shipment.

The Carrier then assumes full responsibility of the shipment.

;Notify the transportation company’s local agent.

;Hold the damaged goods and packing material for the examining agent’s inspection. Do not return any goods to Sterlco before the transportation company inspection and authorization.

;File a claim against the transportation company. Substantiate the claim by referring to the agent’s report. A certified copy of our invoice is available upon request. The original Bill of Lading is attached to our original invoice. If the shipment was prepaid, write us for a receipted transportation bill.

;Advise Sterlco regarding your wish for replacement.

1-7 If the Shipment is Not Complete

Check the packing list. The apparent shortage may be intentional. Back-ordered items are noted on the packing list. You should have:

;SMC Series Chiller

;Bill of Lading

;Packing List

;Operating and Installation Packet

Re-inspect the container and packing material to see if smaller items have been missed during unpacking. Determine that the item was not taken from the area before the shipment was checked in. Notify Sterlco immediately of the shortage.

1-8 If the Shipment is Incorrect

;If the shipment is not what you ordered, contact Sterlco immediately. Include the order number and item.

;Hold the items until shipping instructions are received.

SMC Series Chillers

Page 9

Image 9
Contents SMC-050 to SMC-150 Series SMC Series Chillers Safety Considerations Table of Contents Table of Contents Charts and Figures Introduction General InformationNecessary Documents Models CoveredUncrating Your New Chiller Available OptionsEvent of Shipping Damages If the Shipment is Not CompleteIf the Shipment is Incorrect Returns SMC050A Process Pump CurvesSMC100A Process Pump Curves SMC150A Process Pump Curves SMC-150 25,400 16,000 12A 345 SMC Series Chiller SpecificationsChiller Installation Electrical ConnectionsProcess Water Connections Water Reservoir SMC Condenser Air SupplyEthylene Glycol Curve Overhead Piping Overhead Process ConsiderationsSequence of Operation Chilled Water CircuitRefrigeration Circuit High Pressure Cutout Low Pressure CutoutRemote Start/Stop Interlock SMC Component Identification End of unit piping Piping Schematic 1 Pump with ReservoirPiping Schematic 1 Pump without Reservoir Piping Schematic No Pump, No Reservoir SMC Startup Checklist SMC Pre-Startup ChecklistSMC Water Circuit Pressure Drop Table Setting the Process Water Temperature Setting the Alarm ValueMicroprocessor Control SP AL SMC ControlIndicator Lights SwitchesOptional Graphic Panel Optional Graphic Panel SMC SeriesCondenser Maintenance Routine MaintenanceLubrication Typical SMC SubpanelTypical SMC Wiring Schematic SMC Wiring Schematic for Chillers with No Pump or Reservoir SMC Series Chillers Problem Possible cause Solution Troubleshooting GuideProblem Possible cause Solution Description SMC Spare Parts ListService Notes Service Notes Sterling/Sterlco Milwaukee, WI5200 West Clinton Avenue 414 Fax 414