Subaru Robin Power Products R1300 manual Measuringprocedures, Time to change batteries

Page 22

8.MEASURINGPROCEDURES

-

8-1 MEASURING INSTRUMENTS

8-1-1“Dr.ROBIN” GENERATOR TESTER

The“Dr.Robin”generatortester is exclusively de-

signedforfast,easydiagnosis and repair of Robin generators.

The “Dr. Robin” has the following features:

(1)Functions of voltmeter,frequencymeter, meg-

gertester,capacitancemeter and circuittester are combined in one unit.

(2)Fast and easy readout by digital indicator.

(3)Built-in automaticbatterycheckerindicates the I

time to change batteries.

Fig. 8-7

(4)Tester and accessories are installed in a handy, sturdy case for easycarrying.

0SPECIFICATIO US

Model

 

a

Voltage

 

 

m -

 

 

 

d

Frequency

 

 

 

 

 

CI)

Resistance

 

 

.K-

 

 

5 ’

 

 

 

8

Condenser Capacity

 

I

s

insulation Resistance

I

Circuit Protector

I

PowerSource

 

 

Accessories

 

 

Dimensions (L X W X H)

I

 

Weight

Dr. Robin

0-5OOV AC

25-70HZ

0.1 -1,999 R

10-100 ,uF

3MR

FuseI

Test leads with needle probes. . .1 set Test leads with jack plugs. . . .. 1 set

285 mmx200 rnmxl10 mm

1.6kg

Table 8-1

The “Dr. Robid’generator tester can be ordered from Robin generator distributors by the following part number.

I Dr. Robin Part Number :388-47565-081

-If you donothavea“Dr.Robid’generatortester,usetheinstrumentsdescribed in the followingsection for checking generator parts.

- 20 -

Image 22
Contents Model Section Title Specifications 1300 WPerformance Curves Features General Description 1EXTERNAL View of GeneratorTank \ \ Construction and Function2CONDENSER Control Panel Voltagefluctuationsunderload DC Output 4ELECTRONIC Ignition System OIL Sensor Option 1DESCRIPTION Oil 5CAUTIONS to be Taken on Handling the Sensor Operator may be injured or suffer electric shock Incandescent lamp, heater, etc. withapower factorof 1.O Appliances without any indication asto power consumption Specific Gravity of Batteryelectrolyte 3BATTERY Capacity Measuringprocedures Time to change batteries3METERFREQUENCY Circuittester IPI Measuring Insulation Resistance Control Panel Checkingfunctionalmembers DC Terminal Measure the resistance of the resister 10 ,uF Checkingtableforanaloguecircuittester Disassembly and Assembly 10-2DISASSEMBLY Procedures Green Driver + Driver Two M8 nuts LOmm box wrench 12mm box wrench + Driver LOmm box wrench Box spanner Stator Rotor Rotor Screw the bolt into the thread Mount Remove mount bracketfrom engine Assemblyprocedures 10-3-1FRONT Bracket Stator 10-3-5ENDCOVER 10-3-9FRONT Cover and Element Cover Control Panel Side Secure the side cover with four M5X8 screws 11= Troubleshooting RemedyMow to adjustengine r.p.m AC circuit breaker Resistor RobinAmerica, Inc