Hobart Welding Products OM-945 194 047U manual Selecting Extension Cord Use Shortest Cord Possible

Page 48

12-11. Selecting Extension Cord (Use Shortest Cord Possible)

Cord Lengths for 120 Volt Loads

YIf unit does not have GFCI receptacles, use GFCI-protected extension cord.

 

 

 

Maximum Allowable Cord Length in ft (m) for Conductor Size (AWG)*

 

Current

 

 

 

 

 

 

 

 

 

 

 

Load (Watts)

4

 

 

6

 

8

10

12

 

14

(Amperes)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

5

600

 

 

 

 

350

(106)

225 (68)

137 (42)

 

100 (30)

 

 

 

 

 

 

 

 

 

 

 

7

840

 

 

400

(122)

250 (76)

150 (46)

100 (30)

 

62 (19)

 

 

 

 

 

 

 

 

 

 

10

1200

400 (122)

 

275 (84)

175 (53)

112 (34)

62 (19)

 

50 (15)

 

 

 

 

 

 

 

 

 

 

15

1800

300 (91)

 

175 (53)

112 (34)

75 (23)

37 (11)

 

30 (9)

 

 

 

 

 

 

 

 

 

 

 

20

2400

225 (68)

 

137 (42)

87

(26)

50 (15)

30 (9)

 

 

 

 

 

 

 

 

 

 

 

 

 

25

3000

175 (53)

 

112 (34)

62

(19)

37 (11)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

30

3600

150 (46)

 

87

(26)

50

(15)

37 (11)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

35

4200

125 (38)

 

75

(23)

50

(15)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

40

4800

112 (34)

 

62

(19)

37 (11)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

45

5400

100 (30)

 

62

(19)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

50

6000

87 (26)

 

50

(15)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

*Conductor size is based on maximum 2% voltage drop

Cord Lengths for 240 Volt Loads

YIf unit does not have GFCI receptacles, use GFCI-protected extension cord.

 

 

 

Maximum Allowable Cord Length in ft (m) for Conductor Size (AWG)*

 

Current

 

 

 

 

 

 

 

 

 

 

Load (Watts)

4

 

6

 

8

10

12

 

14

(Amperes)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

5

1200

 

 

 

700

(213)

450 (137)

225 (84)

 

200 (61)

 

 

 

 

 

 

 

 

 

 

 

7

1680

 

 

800 (244)

500

(152)

300 (91)

200 (61)

 

125 (38)

 

 

 

 

 

 

 

 

 

 

 

10

2400

800 (244)

 

550 (168)

350

(107)

225 (69)

125 (38)

 

100 (31)

 

 

 

 

 

 

 

 

 

 

15

3600

600 (183)

 

350 (107)

225 (69)

150 (46)

75 (23)

 

60 (18)

 

 

 

 

 

 

 

 

 

 

20

4800

450 (137)

 

275 (84)

175 (53)

100 (31)

60 (18)

 

 

 

 

 

 

 

 

 

 

 

 

25

6000

350 (107)

 

225 (69)

125 (38)

75 (23)

 

 

 

 

 

 

 

 

 

 

 

 

 

30

7000

300 (91)

 

175 (53)

100 (31)

75 (23)

 

 

 

 

 

 

 

 

 

 

 

 

 

35

8400

250 (76)

 

150 (46)

100 (31)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

40

9600

225 (69)

 

125 (38)

75

(23)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

45

10,800

200 (61)

 

125 (38)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

50

12,000

175 (53)

 

100 (31)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

*Conductor size is based on maximum 2% voltage drop

OM-945 Page 44

Image 48
Contents Processes DescriptionFrom Hobart to You Table of Contents Table of Contents Symbol Usage Arc Welding HazardsEngine Hazards Compressed Air Hazards Principal Safety Standards California Proposition 65 WarningsEMF Information Radiation can cause interferenceSignification des symboles − Consignes DE Sécurité − Lire Avant UtilisationUN Choc Électrique peut tuer LES Fumées ET LES GAZ peuvent être dangereuxLE Soudage peut provoquer un in- cendie ou une explosion DES Particules Volantes peuvent blesser les yeuxDES Pièces Chaudes peuvent provoquer des brûlures graves LE Bruit peut affecter l’ouïe’EXPLOSION DE LA Batterie peut DES Organes Mobiles peuvent provoquer des blessuresLA Chaleur DU Moteur peut pro- voquer un incendie ’AIR Comprimé peut provoquer des blessuresPrincipales normes de sécurité Information sur les champs électromagnétiques− Specifications Symbol DefinitionsWeld, Power, and Engine Specifications − DefinitionsDimensions, Weights, and Operating Angles Generator Power CurveDo not move or operate unit where it could tip Fuel Consumption All Models Duty CycleMaterial Thickness Reference Chart Volt-Ampere Curves− Installation Installing Welding GeneratorEngine Prestart Checks Onan-Powered Units Engine Prestart Checks Kohler-Powered UnitsFuel OilActivating The Dry Charge Battery If Applicable Do not overfill battery cellsRead and follow all instruc ChargerConnecting the Battery Installing Exhaust Pipe+ − Connect negative − cable lastConnecting to Weld Output Terminals Selecting Weld Cable Sizes45 m 60 m 70 m 90 m 105 m 120 m Put terminalsAmperage Selection Table For Stick Smaw Electrodes − Operating the Welding Generator Front Panel Controls− Operating Auxiliary Equipment Standard ReceptaclesCeptacles, use Optional Generator Power Receptacles Wiring Optional 240 Volt Plug− Maintenance ONAN-POWERED Units Maintenance Label Onan-Powered Units Every 500 hEvery 1000 h Servicing Air Cleaner Onan-Powered Units Stop engineOverload Protection Onan-Powered Units Servicing Optional Spark Arrestor Onan-Powered UnitsStop engine. Disconnect nega- tive − battery cable Stop engine and let coolFull Tools Needed Adjusting Engine Speed Onan-Powered Units Idle Speed AdjustmentWeld/Power Speed Adjustment Routine Maintenance Kohler-Powered Units Every 20 hEvery 25 h Replace unreadable labels Maintenance Label Kohler-Powered Units Servicing Air Cleaner Kohler-Powered Units Overload Protection Kohler-Powered Units Servicing Optional Spark Arrestor Kohler-Powered Units802 339-B / S-0842 Adjusting Engine Speed Kohler-Powered Units Stop engine. Reinstall wrapper− Troubleshooting TroubleshootingGenerator Power WeldingEngine − Electrical Diagram − Generator Power Guidelines Selecting EquipmentGrounding Generator To Truck Or Trailer Frame Grounding When Supplying Building Systems How Much Power Does Equipment Require?Earth ground if supplying Amperes x Volts = WattsApproximate Power Requirements For Industrial Motors Approximate Power Requirements For Farm/Home EquipmentIndustrial Motors Rating Starting Watts Running Watts Farm/Home Equipment Rating Starting Watts Running WattsApproximate Power Requirements For Contractor Equipment Contractor Rating Starting Watts Running WattsPower Required To Start Motor How Much Power Can Generator Supply?Single-Phase Induction Motor Starting Requirements KVA/HP x HP x 1000 = Starting AmperageTypical Connections To Supply Standby Power Selecting Extension Cord Use Shortest Cord Possible Current Load Watts AmperesStick Welding Procedure Weld current starts when electrode touches work- piece− Stick Welding Smaw Guidelines Electrode and Amperage Selection Chart Striking an Arc − Scratch Start TechniqueStriking an Arc − Tapping Technique Poor Weld Bead Characteristics Good Weld Bead CharacteristicsPositioning Electrode Holder Conditions That Affect Weld Bead Shape Electrode Movement During WeldingButt Joints Lap JointTee Joint Troubleshooting − Porosity Troubleshooting − Excessive SpatterWeld Test Possible Causes Corrective ActionsTroubleshooting − Incomplete Fusion Troubleshooting − Lack Of PenetrationTroubleshooting − Excessive Penetration Troubleshooting − Burn-Through Troubleshooting − Waviness Of BeadTroubleshooting − Distortion OM-945 − Parts List Main Assembly Onan Engine ShownMain Assembly Panel, Front w/Components Panel, Front w/Components -1Item Generator -1Item Service SupportContact your Distributor for Hobart Welding Products