Allied Air Enterprises 4HP16LT manual Normal Operating Pressures

Page 15

Normal Operating Pressures

Heating & Cooling

Cooling Indoor: 80 db; 67 wb

Heating (indoor): 70°F

± 2 psi

L - Liquid S- Suction

Values provided above are for HSV match pressures; different indoor unit match, and indoor load will cause pressures to vary.

Table 7

due to differences in installations. Significant differences could mean that the system is not properly charged or that a problem exists with some component in the system. Pressures higher than those listed indicate that the system is overcharged. Pressures lower than those listed indicate that the

system is undercharged. Verify adjusted charge using the approach method.

4.Use the same digital thermometer to check liquid line temperature.

506468-01

Issue 1004

Page 15

Image 15
Contents 4HP16LT Series Fastener Torque Installation ClearancesTorque Table GeneralRoof Mounting Electrical WiringSlab Mounting Slab MountingThermostat Designations Without Auxiliary HeatWith Auxiliary Heat Outside Unit Placement Installation Installing Refrigerant LineBrazing Connection Procedure Refrigerant Line Sets Transition from Vertical to Horizontal Refrigerant Line Sets Installing Horizontal RunsR22 refrigerant will be used to flush the system Flushing Existing Line Set and Indoor CoilFlushing Connections Liquid and Suction Line Service Valves Refrigerant Metering DeviceManifold Gauge Set To Close Liquid or Suction Line Service Valve Service ValveBall Type Service Valve Valve Open To Open Liquid or Suction Line Service ValveEvacuation Refrigerant Charge Adjustment Ambient temperature Refrigerant Charging Cooling Cycle Charge Using Weigh-In MethodBlocking Outdoor Coil R410A Temperature/Pressure ChartNormal Operating Pressures Approach Values for TXV Systems Check Charge Using Normal Operating PressuresFilter Drier OperationSensor Temp. / Resistance Range Defrost Board Pressure Switch ConnectionsDelay Mode Issue Defrost Control Board Diagnostic LEDs LED Description System Diagnostic ModuleInterpreting the Diagnostic LEDs Flash CodesShort Cycling 24VAC Power WiringMiswired Module Troubleshooting Thermostat Demand WiringMiswired Module Codes Maintenance Case of extended power outage Heat Pump OperationThermostat Operation Preservice Check Sequence of Operation Start-Up and Performance ChecklistCooling HeatingSingle Stage Wire Diagram Two Stage Wire Diagram