For Machines Mfg. Since 8/09 | P R E P A R A T I O N | Model SB1017 |
PreparationREPARATIONOverview
The purpose of the preparation section is to help you prepare your machine for operation. The list below outlines the basic process to follow to prepare your machine for operation. Specific steps for each of these points will be covered in detail later in this section.
The typical preparation process is as follows:
1.Unpack the machine and inventory the contents of the carton.
2.Clean the machine and its components.
3.Make any necessary adjustments or inspections to ensure the machine is ready for operation.
4.Connect the machine to the power source.
5.Test run the machine to make sure it functions properly and is ready for operation.
Required for Setup
The items listed below are required to successfully set up and prepare this machine for operation.
For Power Connection
•A power source that meets the minimum circuit requirements for this machine. (Refer to the Power Supply Requirements section for details.)
•A qualified electrician to ensure a safe and
Power Supply
Requirements
Availability
Before installing the machine, consider the availability and proximity of the required power supply circuit. If an existing circuit does not meet the requirements for this machine, a new circuit must be installed.
To minimize the risk of electrocution, fire, or equipment damage, installation work and electrical wiring must be done by a qualified electrician in accordance with all applicable codes and standards.
Electrocution or fire may occur if machine is not correctly grounded and attached to the power supply. Use a qualified electrician to ensure a safe power connection.
Full-Load Current Rating
The
| 8.6 Amps |
4.3 Amps |
The
If the machine is overloaded for a sufficient length of time, damage, overheating, or fire may