Roper M6707-1-1 manual Super PRO GUN

Page 10

NOTE

Onceinplacethespringofthe7304-4-1(LipSeal)shouldbefacingout.

3.Screw the 5105-10-1 (Trigger Nut) into the 5110-7-1 (Gun Handle) and tighten. Coat the 5110-4-1 (trigger stem) with 6706-3-1 (Pro Gun Oil) and install from the inside cavity of the 5110-7-1 (Gun Handle) through the 5105-10-1 (trigger nut).

4.Place the 5105-15-01 (Pivot Plate) into the slot in the

5110-7-1 (Gun Handle Assembly), and push the 7203-4-10 (Slotted Spring Pin) located on the backside of the 5105-16-1 (Trigger) into the hole in the 5110-4-1 (Trigger Stem). Line up the 5105-15-2 (Pivot Plate Bushing) to the lower pivot hole in the Gun Handle, insert the 7102-10-12 (Slotted Flat Head Screw) and tighten.

NOTE

WheninstallingtheTriggerAssemblythe5105-8-1(TriggerLock)mustbein the“down”position. Youmayfinditeasiertoassemblethegunhandleby placingtheflatsatthebackofthe5110-7-1(GunHandle)inavise. Thiswill supporttherearscrews(5105-13-1)frompushingdownduringassembly.

5.Set the 9203-2-1 (Compression Spring) into the spring seat located in the upper cavity of the 5110-7-1 (Gun Handle).

NOTE

For2-stagechopperonly.

Set the 5110-3-1 (two position gun detent plate) over the 9203-2-1 (Compression Spring). The elevated shoulder of the 5110-3-1 (two position detent plate) faces up.

6.Place the small pinhole in the 5110-2-1 (Slide Valve) over the pin through the 5110-4-1 (Trigger Stem), and push down compressing the spring into the handle cavity.

7.Place the 5110-5-1 (Gun Handle Gasket) over the screws, matching the slot to the slot in the 5110-7-1 (Gun Handle).

8.Lightly lubricate the topside of the 5110-1-1 (Porting Plate) with 6706-3-1 (Pro Gun Oil) and push it over the 5110-2-1 (Slide Valve) keeping the Slide Valve connected to the 7203-4-9 (Slotted Spring Pin) in the 5110-4-1 (Trigger Stem).

SUPER PRO GUN &

5

SUPER PRO GUN II

 

Image 10
Contents Super PRO GUN & Super PRO GUN Super PRO GUN & Super PRO GUN Corporate HQ & Mfg ManufacturingTable of Contents Super PRO GUN Repair Kit Super PRO GUN II Repair Kit Actuator Assembly See Figs .1 & 9.2 for exploded schematic drawingsSuper PRO GUN Handle Assembly See Figs .3 & 9.4 for exploded schematic drawingsSee Figs .5 & 9.6 for exploded schematic drawings Super PRO GUNSuper PRO GUN Super PRO GUN Flush Valve Assembly Gun Block AssemblySee Figs .9 9.12 for exploded schematic drawings Gun Block Assembly Super PRO GUN Super PRO GUN Super PRO GUN Super PRO GUN Super PRO GUN SuperCutter Assembly See Figs .13 9.20 for exploded schematic drawingsRotor Assembly Rubber Roll Assembly Rubber Roll Adjustment Idler Adjustment Actuator Disassembly Handle Disassembly Handle Disassembly Gun Block Disassembly Flush Valve Disassembly Procedures SuperCutter Disassembly Rubber Roll DisassemblyRotor Disassembly Assembly Drawings Super PRO GUN Super PRO GUN Super PRO GUN Super PRO GUN Super PRO GUN Super PRO GUN Super PRO GUN Super PRO GUN Super PRO GUN Super PRO GUN Super PRO GUN Super PRO GUN Super PRO GUN Super PRO GUN Super PRO GUN Super PRO GUN Super PRO GUN Super PRO GUN Super PRO GUN Super PRO GUN Super PRO GUN Super PRO GUN Super PRO GUN & Super PRO GUN Super PRO GUN & Super PRO GUN Corporate HQ & Mfg Manufacturing/Sales