Cisco Systems C819GUK9, C819HK9 Items Shipped with your Router, Additional Items, Connections

Page 47

Chapter 2 Installing the Router

Equipment, Tools, and Connections

Items Shipped with your Router

Unpack the box and verify that all items listed on the invoice were shipped with the Cisco 819 ISR. The following items are shipped with your router:

AC power supply (default)

AC power supply cable (default)

Cisco Configuration Professional (Cisco CP) CD

DC power supply (optional)

Power cord retention lock (available in Cisco 819HGW, Cisco 819HWD, Cisco 819HG-4G, and Cisco 819G-4G ISRs only)

Power switch lock (available in Cisco 819HGW, Cisco 819HWD, and Cisco 819HG-4G ISRs only)

RJ-45-to-DB-9 console cable.

Straight-through RJ-45 Ethernet cable

Two cellular multiband swivel mount dipole antennas

Three WiFi antennas for Cisco 819HGW and Cisco 819HWD ISRs

Note AC or DC Power supply is included based on what is ordered.

Additional Items

The following items are not shipped with the router but are required for installation:

ESD-preventive cord and wrist strap.

Screws for mounting the router on a wall.

Two number-10 wood screws (round- or pan-head) with number-10 washers or two number-10 washer-head screws, for mounting on a wall stud. The screws must be long enough to penetrate at least 3/4 inch (20 mm) into the supporting wood or metal wall stud.

Two number-10 wall anchors with washers, for mounting the router on a hollow wall.

Wire crimper for chassis grounding.

Wire for connecting the chassis to an earth ground.

AWG 14 (2 mm2) or larger wire for NEC-compliant chassis grounding.

AWG 18 (1 mm2) or larger wire for EN/IEC 60950–compliant chassis grounding.

Ring terminal with an inner diameter of 1/4 inch. (5 to 7 mm) for NEC-compliant chassis grounding.

Ethernet cables for connecting to the Fast Ethernet (FE) WAN and LAN ports.

Connections

Obtain a broadband or Ethernet connection from your service provider.

Cisco 819 Integrated Services Router Hardware Installation Guide

 

OL-23125-02

2-3

 

 

 

Image 47
Contents Text Part Number OL-23125-02 Americas HeadquartersPage N T E N T S Connecting a Terminal or PC to the Console Port Contents OL-23125-02 Audience ObjectiveChapter Name Description OrganizationConventions Warnung Wichtige Sicherheitshinweise Bewaar Deze InstructiesAviso Instruções Importantes DE Segurança Avvertenza Importanti Istruzioni Sulla SicurezzaPage GEM Disse Anvisninger Page OL-23125-02 Page Searching Cisco Documents Related DocumentationPreface OL-23125-02 General Description Product OverviewWlan LED Cisco 819HG Integrated Services Router3shows the front panel details of the Cisco 819HG ISR 4shows the front panel details of the Cisco 819HGW ISR SKU ID SKU InformationSKU ID Support Description WiFi External AntennaFrequency Band Description ModeHSPA+/HSPA Rebranding of C8xx-B and EHWIC-3G-EVDO-B Hardware FeaturesGB Dram Platform Features for Cisco 819 ISRsMB Dram Snmp AntennasColor Description Power SwitchReset Button LEDsRssi Wlan LED 7describes the 4G LTE LEDs for the Cisco 819 ISR SIM MemoryTwo Internal SIM Card Slots Embedded 3G ModemEmbedded 4G LTE Modem SIM Card3G-ACC-OUT-LA Supported Cisco Antennas and Cables3G-ANTM-OUT-OM 3G-ANTM-OUT-LPAIR-ANT2440NV-R AIR-ANTM2050D-RAIR-ANT2430V-R AIR-ANT5140V-RMaximum Gain Cisco Part Number Description Frequency Ranges Maximum Insertion AIR-CAB005LL-RAIR-CAB020LL-R AIR-CAB050LL-R4G-CAB-ULL-50 Serial Port4G-CAB-ULL-20 AC Power Adapter Power SupplyCisco Part Number Accessory AccessoriesOL-23125-02 Installing the Router Equipment, Tools, and Connections Connections Items Shipped with your RouterAdditional Items Ethernet Devices Installing the RouterAccessing the SIM Card Accessing the SIM Cards Installing AntennasInstalling the Antenna Installing a WiFi External AntennaMounting on a Wall Installing on a TableAttaching the Standard Brackets Installing the Router to the Wall Installing a DIN RailTurn the router sideways so that the antenna is at the top Cisco 819 ISR Installed with the DIN Rail Installing the Router Ground ConnectionChassis Ground Connection Using Ring Terminal Installing the Power Cord Retention Lock10 Pre-assemble the O-Ring onto the Barrel 12 Installing Power Cord Lock onto the Router Installing the Power Switch Lock14 Installing Power Switch Lock 16 DC Power Supply Wall-Mounting Features Mounting the DC Power SupplyOL-23125-02 Preventing Damage to the Router Preparing to Connect the RouterConnecting an External Ethernet Switch Connecting a PC, Server, or WorkstationConnecting to an Ethernet Switch Connecting a Terminal or PC to the Console Port Connecting a Terminal or PC to the Console PortTerminal Emulator Settings Connecting a Modem to the Console PortConnecting the DC Adapter Connecting the AC AdapterDC Power Supply PWR1-20W-12VDC and PWR1-20W-24VDC LEDs to Check Normal Patterns Verifying ConnectionsCisco IOS CLI Cisco Configuration Professional ExpressUsername username privilege 15 secret 0 password Enter a hostname for the router this example uses Router Setup Command FacilityConfiguration is displayed Verifying the Initial Configuration OL-23125-02 Router Specifications Technical SpecificationsMaximum Power 11 W 20 W Consumption Transportation/Storage Conditions Martek Railway Power Adapters2 SKUs Mtbf hours Mean Time Between Failure Ground Benign EnvironmentRange 4G LTE SKUs 3GSKUs Supported Power AdaptersC819G+7-K9 C819G-B-K9C819HG-S-K9 C819HGW+7-E-K9 Range 4G LTE SKUs 3G SKUs 3G + WiFi SKUsC819HGW-S-A-K9 C819HG-B-K9 C819HGW-V-A-K9
Related manuals
Manual 196 pages 51.42 Kb