Jet Tools HBVS-7MW manual Changing Blades Disconnect the machine from the power source

Page 15

Changing Blades

1.Disconnect the machine from the power source.

2.Raise the saw arm to the vertical position and lock in place by turning the hydraulic cylinder off.

3.Remove the red blade guard assembly (A, Fig. 12) by removing two screws (B, Fig.12).

4.Remove the brush assembly (C, Fig. 12) by removing two screws (0, Fig. 12).

5. Loosen blade tension by turning the blade

Fig.12

tension knob counter-clockwise.

 

6.Carefully remove the old blade. Caution: blade teeth are sharp. Handle with care.

7.Install the new blade by placing the blade between blade guides first. Make sure the blade teeth face the same direction as indicated on the label found on the saw arm.

8.Place the blade around both wheels. Make sure

the blade edge rests near the wheel flange on both wheels.

9

Image 15
Contents JET Proof of Purchase Limited WarrantyReplacement Part Warranty Limited Tool and Equipment Warranty~ Warning Minimum Gage for cord AWGGro~nding Instructions Chart Make certain the machine is properly HVBS-7MW Table of ContentsUnpacking and Clean-Up Shipping Container ContentsVertical Cutting Plate Assembly Hydraulic Feed Selector Operation Electrical ConnectionsPrior to Operation Vise Adj ustment Adjusting the Blade GuidesAdjusting Blade Tension Changing Blades Disconnect the machine from the power source Adjusting Blade Square to Vise Adjusting Blade Tracking Adjusting Blade Guide Bearings Adjusting Automatic Shutoff Chip Cleaning Brush Maintenance~~~5~ 932-1504 Size Qty Parts List For The HVBS-7MW Bandsaw IndexHVBS7MW-89 HigherHVBS7MW-100 HVBS7MW-98HVBS7MW-GB HVBS7MW-152AElectrical Schematic