GE 5GEB22 manual Belts, Atorto, Thiswill, Clean, Andconst

Page 12

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

GEK-91696D

 

 

 

 

 

 

 

inchesforV-beltapplication.

 

 

 

 

 

 

 

 

1150HPWhereACDrillDing=MiniMotor,Modelsheave5GEB22pitchdiameter

 

 

 

 

 

 

 

 

 

 

HP/RPM=

 

mumratioofhorsepower,includingoverloads,tothespeedwhichthatpoweroccurs.

 

 

 

 

 

W=Maximumallowableradialload.

 

 

 

andconst

belttensionis

asilymaintained

 

 

 

Be

−drivenmachinesmaybeequippedwithslidingrails.Pr

 

 

CAUTIObenN:eOvercorectly−tighteningadjusted,toavoidthebeltsandthisslippagepulleysmayhaveresultnotbeeninearlychosfilreseratingproperlyofmethodbelts,fullccurstheshafts,job.andbearings.

 

 

 

Sliding

 

 

andthereplacementofbeltsis

 

.Thisreducestheoperatingcostan

 

increasesthefficiency.e

 

 

B

ltidlersreducethelifeofthebeltssimplifieda shouldnotbeusedifanyother

 

is

 

.Thebltsshould

 

 

raisaretobeusedforfloormountingonly.

 

 

 

 

 

availablefterthebeltthensionhas

 

 

shouldbeadjusteduntilonlyavesslightbowappersintheslackside.Ifslippage

 

 

 

 

nverbeforcedoverthes

 

.Whenthedriveisstartedandp

Informationspeedndfullload,

take−up

 

 

B

 

 

 

shouldbecheckedandadjustedfollowingthebeltmanufacturer’s

 

 

 

.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Theretensionis

adropintensionduingthefirst24to48hoursofoperation.recommendationsDuringthis"r in"priod,the

 

 

afterseatayormallytwoofperation.

 

 

 

andinitial

isremoved.Belttension

 

berechecked

 

 

belts

 

themselvesin

sheavegoovesr

 

 

 

clean

beltsrunsmoother,lookbetter,andlastlonger.Long

beltliferesultsifthebeltsa

sheavesarekept

 

1.4.6.3.

 

thebeltsarepreventedfromrubbingagainstthestretchbltguardsorotherobstructioshouldn.

 

 

 

 

 

 

MatchedGouigand

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

1.4.6.4.OnAistotopuddlLeveshouldFxrich,giveoncbealldnonbeaprepaedretemountingundestiffC−shrinkfoundations,mixtureplngAlignmtheProprietarygroutbasebasethe.The.site,supportsshouldclean,minimumcementProcbebutbeforeusedderoughof−sand.onesettingHighsurfaceinchratio−gradethe(25ofofbasemm)1:2thegroutisinshouldfoundationrecommpositionmixtursbeeallowed.ndedshouldBeforeare.availableJustforgroutingbewtenoughgroutingcommerciallyandthewater.thebase,groutrammedshouldthe.Ifalignmentthebegroutusedor

 

1

Removecheckedall

ngfollows:boltsndslidetheshellsbackso

hbfacesareexposed.

 

 

2Chek

couplinghubspacingisinaccordancewiththeoutlinedimensionswiththeunitsinthemecan-

 

3.

icalcenteroftheirendplay.

thelargestunit(usually

 

ornearthemidleofmultipleunits.Check

 

 

wthethecouplingnext

 

12

4.

 

atorto

hubndusetheoutsidediameerofthemotor)her

to

indcationofthemisalign-

anInsertrotationmStartindicximum270felerin90dgreessurevariationmentdegreeinremntsgagedialorshouldreorduseindicatorthenot.Rotexceedauntilteindicatorbothfivesets0.002inchesshaftsathuboftogetherrefcesa(0dings.05mm).90Measureartakndgreandrepat.sincememberthe.Thegapfifthbtweengivesettheofgaphubreadingsreadingsfacesreadingsisat.0,checkContinue90,180

 

 

the

dialalig

the

byusing

straightedgeacrossthetwoubsatverticalandhorzontal.O,clap

dial

 

 

ent.Be

 

 

supportsdonotbendorsag,

thiswill

inaccurate

.The

Image 12
Contents Transportation Document No. GEK-91696, Rev. DDesiredorshouldpartiularproblemsariseth OrdisclosureisstrictlyIsdiclos CONTENTS1150HPACDrillingMotor,Model5GEB22 GEK-91696DToolsandmaterialsrequiredtoperformtheprocedures MtormodelToTable9insection61.2.DrillMotorGeneral GeneraldrillingmotornformationOffsho InypicaloilwelldrillingindustryrigenvionmentsIssuitablefor 1150HPACDrillingMotor,Model5GEB22Withstelcomponnts WihtheblowerandvariRequir GEK-91696D GEK-91696D 1892 25º773331 9200NationalOilwellVarco GD3000EACDriveSystemType2400SeriesPart#109341withorwithoutasmoothinginductor RossHill6ModelABBACS800manufacturedbyNOVLationoftheconductorsmachin Grounding.ReferenceABSRulesforherentlyBuilndgInhibitorinstallation,theexposedcomponents MotorCouplingandAlignmentPrtectthegroundstud,nut,andcablelugconnectionfromcorrosion GoodalignmentwillbereturnedbearingsreduceddowntimeClean BeltsAtorto ThiswillCooling TweenthemachinesandthebaseMeeti ngIP56 RecheckthePowerCableInspection TothepowercomponentsoftheOrcircuit,ahigh 1150HPACDrilling4Apply ReplacemissinghardwareandtightenlooseboltsWat 13untilalltheRTDMaycause Ing.TheinernalClaningdrill TorlifeRemovethe 1150HPACDrillingMotor,Model5GEB22Trque TheBackrotorthelockigjamnutsboltsawyfrmthebearingcapInstallcoverandsidepaneltocratethemotor BoltsandGEK-91696D FootholeswiththeRust otherdefects 4Attach ThebckingGEK-91696D ScrewHanc CMPONENTIDENTIFICATIONofthispublicaio,unlersWooden ± ± 1150HPACDrillingMotor,ModelGEK-5GEB2291696D SupporttheweightoftheDE Head11with BearingassemblyRemovaloftheconnectionend UseanarborprssandfixturestoExamine InspectthestatorcoilsandbusringsasStatorCoilsand BusringsfordamagedorEto,Clea KgthCnBycuttingand RequiringtheBerialeliminatestheneedforflux Whichmust flatalongtheentirelenghofthejointOutortofillvids DiancanbeusedAgent Erie,PA16531Dair,looseneddebrismay ElectricalTetingIntroductionWeightstotheendplate ProceduresforthebalanceFollow ToholdProceduresforcompressedai 2InspectallCEbearingassemblycomponenttodebrisUmb Sonnel.EnureallpersonnelPage Ensurethe InnerSshowninFigure10 MakgtheDEBearingpilotandGuideStudsInstalled GEK-91696D Levelthe WiththeAvy-duty MountthestatorfToch OnthefaceoftheConnectionEndCEoftherotorshaft53Zerothedial ReadingonthefaceoftheCErotorbearing34outerrace PoitiontoavoiddamagetotheRepeattheminimumclearancecheckf FtheThebearingrollerswillpublicationrollverthe 3ZerothedialClampadial Fure13Ingcap.Zerothe PassThreephasesshouldbebetween130and150 PerfoFollowingsequence.Applied AndcorrectthfitasfllowsOntheshaft AtthelargeTheshaft Theadvancwithin IfnecssarytoRkacrosstheendofshaft IsonlyanesimateandshouldbePrat DoneAlongthe 93A41DrillMotorApplicationData Unoutmasuredfromshafttoouterrace,eachend,in.mm920012474 Drivendbearinggreaselubricationcapacity,ouncegramMinerallkali,OilViscosityat100F,37.74C,SSU ColorBasewithAntioxidant RsistanceTimetoReach20psiDropat210F,Hr.Min 10001150HPACDrillingMotor,11 Inspectiondata GEK1150-91696DHPACDrillingMotor,Model5GEB22 DEOuterSleeveRemovalToolAssembly6751547G4 GEK1150-91696DHPACDrillingMotor, Model 5GEB22 DEInnerBearingCapRemovalToolAssembly6751547G6 DEInnerSleeve RemovalToolAssembly 6751547G7 41A235078P1 ThefllowinglistofcompoentsinT1X4.75GRADE8 IndividualCompnentsofToolAssemblies1150HPACDrillingMotor,Model5GEB22 1150HPAC Drill ingMotor,ModelGEK-5GEB2291696D GEK1150-91696DHPACDrillingMotor, Model5GEB22 Ring6727124G1Item5 1150GEK-91696DHPACDrillingMotor, Model5GEB22 Ring6727110G1Item9 Clamp6733346P6Item10 B5511G1 N22P39040093 9P14 THICKX3.9IDX5.5ODGEK1150-91696DHPACDrillingMotor,1Model5GEB22 HubRemovalToolBackingPlate41B535119G1 1150HPACDrillingMotor, 1.Model00GEK-5GEB2291696DGEK1150-91696DHPAC DrillingMotor,Model5GEB223.125 BearingNutSpannerWrench9945228 CEDummyBearingCap41C689896 DEBearingGuide 1150HPACDrillingMotor,ModelGEK-5GEB2291696DDEDummyBearingCap6796493P3 HubInstallationAdvanceGage 70NWREV091030621--98,098,2MGC/DGKGMDPABGAS