GE 5GEB22 manual Boltsand, Installcoverandsidepaneltocratethemotor, GEK-91696D, Footholeswiththe

Page 18

 

 

 

 

 

 

 

 

 

 

GEK-91696D

 

 

 

 

 

 

 

 

 

1150..2.HPMotorACDrillPackagingMotor,forModelShipment5GEB22

shouldbesecurelypackagedtoavoiddamageduringshipment.

 

Afterlocking

 

rotor

 

shipment,the

 

1.

PreparewoodstockofsufficientlengthmotorskidthemotorasshowninFigure7.Theyellowpinewoodstock

 

Topackagethe

 

 

forshipment:

 

 

 

 

 

mustbeablemotorsupporttheapproximate5700lbs.(2585kg)weightofthemotor(notincludingtheblower

 

2.Drill162in.(41,2mm)clearanceholesinthewoodstocktofittheholesinthemotormountingfeet(four

 

andconnectionbox).

 

 

 

 

 

WARNING:hols)The.ill

 

weighsapproximately5689lbs.(2580kg).Useappropriateliftingdeviceswhenlifting

themotor.Failuremotordosomayresultininjuryordeath.

 

 

 

3.Toavoiddamagelifttothethemotormotorbyduringtherotorhandling:shaft.

 

 

 

 

b.

Donot

allow

motortoimpactanotherobjectwhenlifed.

 

 

4

c.

 

 

therotorwithstrapsorbandingforshipment.Anysecuringstrapsorbandingshould

Liftthemotorbewrappedontothearoundwoodtheframemotorandframealignthe.

footholeswiththe

frameholes.

5Insallfur1.5–6

.boltsand

throughthemotormountingfeetandwoodstockframe.Tightenthe

 

boltintoposition.

 

 

 

 

 

 

5.1.3.Motor6The1..moWhenSlushStoragethepreparingshouldmachinedbetheprparedsurfacesmotorforforwithstorage:ashersrusttoinhibitorpreventdamagebeforeenclosing.themotorforshipment.

 

a.

Constructalatform securethemotorasdecribed section5.1.2.MotorPackagingforShip-

 

b.

Slushthe

xposedmachinedsurfaceswith

rustinhibitor.

 

 

 

c.

ment

this

ublication.

−condensationheaterthatallowtheheaterleadstobeconnectedto

 

anexternalwireleadspowertosourcetheanti.

18

d.

Installcoverandsidepaneltocratethemotor.

 

 

e.

Applypowertotheanti−condensationheaterwhilemotorisstored.

 

 

Image 18
Contents Transportation Document No. GEK-91696, Rev. DDesiredorshouldpartiularproblemsariseth OrdisclosureisstrictlyIsdiclos CONTENTS1150HPACDrillingMotor,Model5GEB22 GEK-91696DToTable9insection61.2.DrillMotorGeneral ToolsandmaterialsrequiredtoperformtheproceduresMtormodel GeneraldrillingmotornformationIssuitablefor OffshoInypicaloilwelldrillingindustryrigenvionments 1150HPACDrillingMotor,Model5GEB22Withstelcomponnts WihtheblowerandvariRequir GEK-91696D 3331 GEK-91696D1892 25º77 9200Type2400SeriesPart#109341withorwithoutasmoothinginductor NationalOilwellVarcoGD3000EACDriveSystem RossHill6ModelABBACS800manufacturedbyNOVLationoftheconductorsmachin Grounding.ReferenceABSRulesforherentlyBuilndgPrtectthegroundstud,nut,andcablelugconnectionfromcorrosion Inhibitorinstallation,theexposedcomponentsMotorCouplingandAlignment GoodalignmentwillbereturnedbearingsreduceddowntimeAtorto CleanBelts ThiswillMeeti ngIP56 CoolingTweenthemachinesandthebase RechecktheOrcircuit,ahigh PowerCableInspectionTothepowercomponentsofthe 1150HPACDrillingWat 4ApplyReplacemissinghardwareandtightenloosebolts 13untilalltheRTDClaningdrill MaycauseIng.Theinernal TorlifeTrque Removethe1150HPACDrillingMotor,Model5GEB22 TheBackrotorthelockigjamnutsboltsawyfrmthebearingcapGEK-91696D InstallcoverandsidepaneltocratethemotorBoltsand FootholeswiththeRust otherdefects GEK-91696D 4AttachThebcking ScrewHanc CMPONENTIDENTIFICATIONofthispublicaio,unlersWooden ± ± 1150HPACDrillingMotor,ModelGEK-5GEB2291696D Removaloftheconnectionend SupporttheweightoftheDE Head11withBearingassembly UseanarborprssandfixturestoStatorCoilsand ExamineInspectthestatorcoilsandbusringsas BusringsfordamagedorBycuttingand Eto,CleaKgthCn RequiringtheOutortofillvids BerialeliminatestheneedforfluxWhichmust flatalongtheentirelenghofthejoint DiancanbeusedAgent Erie,PA16531Dair,looseneddebrismay ElectricalTetingIntroductionFollow WeightstotheendplateProceduresforthebalance ToholdUmb Proceduresforcompressedai2InspectallCEbearingassemblycomponenttodebris Sonnel.EnureallpersonnelPage SshowninFigure10 EnsuretheInner MakgtheDEBearingpilotandGuideStudsInstalled GEK-91696D Avy-duty LeveltheWiththe Mountthestatorf3Zerothedial ReadingonthefaceoftheCErotorbearing34outerrace TochOnthefaceoftheConnectionEndCEoftherotorshaft5 PoitiontoavoiddamagetotheThebearingrollerswillpublicationrollverthe RepeattheminimumclearancecheckfFthe 3ZerothedialIngcap.Zerothe ClampadialFure13 PassFollowingsequence.Applied Threephasesshouldbebetween130and150Perfo AndcorrectthfitasfllowsOntheshaft AtthelargeTheshaft Rkacrosstheendofshaft TheadvancwithinIfnecssaryto IsonlyanesimateandshouldbeAlongthe PratDone 93A41920012474 DrillMotorApplicationDataUnoutmasuredfromshafttoouterrace,eachend,in.mm Drivendbearinggreaselubricationcapacity,ouncegramBasewithAntioxidant Minerallkali,OilViscosityat100F,37.74C,SSUColor RsistanceTimetoReach20psiDropat210F,Hr.Min 10001150HPACDrillingMotor,11 Inspectiondata GEK1150-91696DHPACDrillingMotor,Model5GEB22 DEOuterSleeveRemovalToolAssembly6751547G4 GEK1150-91696DHPACDrillingMotor, Model 5GEB22 DEInnerBearingCapRemovalToolAssembly6751547G6 DEInnerSleeve RemovalToolAssembly 6751547G7 1X4.75GRADE8 41A235078P1ThefllowinglistofcompoentsinT IndividualCompnentsofToolAssemblies1150HPACDrillingMotor,Model5GEB22 1150HPAC Drill ingMotor,ModelGEK-5GEB2291696D GEK1150-91696DHPACDrillingMotor, Model5GEB22 Ring6727124G1Item5 1150GEK-91696DHPACDrillingMotor, Model5GEB22 Ring6727110G1Item9 Clamp6733346P6Item10 093 9P14 B5511G1N22P39040 THICKX3.9IDX5.5ODGEK1150-91696DHPACDrillingMotor,1Model5GEB22 HubRemovalToolBackingPlate41B535119G1 1150HPACDrillingMotor, 1.Model00GEK-5GEB2291696DGEK1150-91696DHPAC DrillingMotor,Model5GEB223.125 BearingNutSpannerWrench9945228 CEDummyBearingCap41C689896 DEBearingGuide 1150HPACDrillingMotor,ModelGEK-5GEB2291696DDEDummyBearingCap6796493P3 HubInstallationAdvanceGage 70NWREV091030621--98,098,2MGC/DGKGMDPABGAS