GE 5GEB22 manual Removaloftheconnectionend, SupporttheweightoftheDE Head11with, Bearingassembly

Page 24

 

 

 

 

 

 

GEK-91696DHPACDrillingMotor,Model5GEB22

 

 

 

 

 

1150.2.4.

DriveEndBearingAssmblyRemoval

 

 

umb

inFigure15locatedinsection6.2.DRILLMOTOR

 

 

TE:Numbersinparenthesis()refertoitem

 

Thefollowingprocedur

detailsthediveend(DE)bearingassembly(Figure10)removal.ToremovetheDE

 

bearingassembly:

 

 

 

 

 

noted.

 

COMPONENTIDENTIFICATIONofthispublication,unlers

 

1

Remove

boltsandtheflatwashers(8)fromtouterotherwisebearingcap(7).

 

2.

SupporttheweightoftheDE

head(11)with

hoist,takingcarenottolifttherotoroffitssupport.

 

 

innerbearingcap(12)fromtheframetor.

 

 

 

 

 

3

Assemblethebaringpullerandusethehydraulicjacktopulltheframehead(11),rollerbearing(3),and

 

Useanarborprssandfixturesto

 

 

thebearingassembly(3)fromtheDEframehead(11).

 

4.

Removetheinnershaftcollar(1)onlyifdamaged,ifoutsideofinspectionlimits,oriftheshaftmustbere-

5.2.5.

 

movedfromtherotor.Ifnecessary,separateusepullertoremovethesleeve.

Connecti EndFrameHeadRemoval

 

 

 

 

 

 

connections.Toremove

CEframehead:

mayberequiredtogainacesstothebusringsandstatorcoil

 

Removaloftheconnectionend

 

 

 

TE:Numbersinparenthesis()refertoitem

umb

inFigure15locatedinsection6.2.DRILLMOTOR

 

 

COMPONENTIDENTIFICATIONofthispublication,unlrsotherwisenoted.

 

 

1

Removethe

boltsandflatwashers(28)holdingtheframehead(27)tothestatorframe(21).

WARNING:.weith23Failure..ThreadoutLiftThetheboltstoCEdothreeframeframeuntilsoeightmay1head–head8x3frameresult(27)jackweighsfromoutheadininjuryboltsapprximatelytheisfreestatorintodeathofthetheframethreaded.stator220(21)lbs.framehols.(100(21)ofkg)thefit.Use.CEframeappropriatehead(27)lifting.Evenlydevicestightenforthethisjack

24

Image 24
Contents Transportation Document No. GEK-91696, Rev. DDesiredorshouldpartiularproblemsariseth OrdisclosureisstrictlyIsdiclos CONTENTS1150HPACDrillingMotor,Model5GEB22 GEK-91696DToolsandmaterialsrequiredtoperformtheprocedures MtormodelToTable9insection61.2.DrillMotorGeneral GeneraldrillingmotornformationOffsho InypicaloilwelldrillingindustryrigenvionmentsIssuitablefor 1150HPACDrillingMotor,Model5GEB22Withstelcomponnts WihtheblowerandvariRequir GEK-91696D GEK-91696D 1892 25º773331 9200NationalOilwellVarco GD3000EACDriveSystemType2400SeriesPart#109341withorwithoutasmoothinginductor RossHill6ModelABBACS800manufacturedbyNOVLationoftheconductorsmachin Grounding.ReferenceABSRulesforherentlyBuilndgInhibitorinstallation,theexposedcomponents MotorCouplingandAlignmentPrtectthegroundstud,nut,andcablelugconnectionfromcorrosion GoodalignmentwillbereturnedbearingsreduceddowntimeClean BeltsAtorto ThiswillCooling TweenthemachinesandthebaseMeeti ngIP56 RecheckthePowerCableInspection TothepowercomponentsoftheOrcircuit,ahigh 1150HPACDrilling4Apply ReplacemissinghardwareandtightenlooseboltsWat 13untilalltheRTDMaycause Ing.TheinernalClaningdrill TorlifeRemovethe 1150HPACDrillingMotor,Model5GEB22Trque TheBackrotorthelockigjamnutsboltsawyfrmthebearingcapInstallcoverandsidepaneltocratethemotor BoltsandGEK-91696D FootholeswiththeRust otherdefects 4Attach ThebckingGEK-91696D ScrewHanc CMPONENTIDENTIFICATIONofthispublicaio,unlersWooden ± ± 1150HPACDrillingMotor,ModelGEK-5GEB2291696D SupporttheweightoftheDE Head11with BearingassemblyRemovaloftheconnectionend UseanarborprssandfixturestoExamine InspectthestatorcoilsandbusringsasStatorCoilsand BusringsfordamagedorEto,Clea KgthCnBycuttingand RequiringtheBerialeliminatestheneedforflux Whichmust flatalongtheentirelenghofthejointOutortofillvids DiancanbeusedAgent Erie,PA16531Dair,looseneddebrismay ElectricalTetingIntroductionWeightstotheendplate ProceduresforthebalanceFollow ToholdProceduresforcompressedai 2InspectallCEbearingassemblycomponenttodebrisUmb Sonnel.EnureallpersonnelPage Ensurethe InnerSshowninFigure10 MakgtheDEBearingpilotandGuideStudsInstalled GEK-91696D Levelthe WiththeAvy-duty MountthestatorfToch OnthefaceoftheConnectionEndCEoftherotorshaft53Zerothedial ReadingonthefaceoftheCErotorbearing34outerrace PoitiontoavoiddamagetotheRepeattheminimumclearancecheckf FtheThebearingrollerswillpublicationrollverthe 3ZerothedialClampadial Fure13Ingcap.Zerothe PassThreephasesshouldbebetween130and150 PerfoFollowingsequence.Applied AndcorrectthfitasfllowsOntheshaft AtthelargeTheshaft Theadvancwithin IfnecssarytoRkacrosstheendofshaft IsonlyanesimateandshouldbePrat DoneAlongthe 93A41DrillMotorApplicationData Unoutmasuredfromshafttoouterrace,eachend,in.mm920012474 Drivendbearinggreaselubricationcapacity,ouncegramMinerallkali,OilViscosityat100F,37.74C,SSU ColorBasewithAntioxidant RsistanceTimetoReach20psiDropat210F,Hr.Min 10001150HPACDrillingMotor,11 Inspectiondata GEK1150-91696DHPACDrillingMotor,Model5GEB22 DEOuterSleeveRemovalToolAssembly6751547G4 GEK1150-91696DHPACDrillingMotor, Model 5GEB22 DEInnerBearingCapRemovalToolAssembly6751547G6 DEInnerSleeve RemovalToolAssembly 6751547G7 41A235078P1 ThefllowinglistofcompoentsinT1X4.75GRADE8 IndividualCompnentsofToolAssemblies1150HPACDrillingMotor,Model5GEB22 1150HPAC Drill ingMotor,ModelGEK-5GEB2291696D GEK1150-91696DHPACDrillingMotor, Model5GEB22 Ring6727124G1Item5 1150GEK-91696DHPACDrillingMotor, Model5GEB22 Ring6727110G1Item9 Clamp6733346P6Item10 B5511G1 N22P39040093 9P14 THICKX3.9IDX5.5ODGEK1150-91696DHPACDrillingMotor,1Model5GEB22 HubRemovalToolBackingPlate41B535119G1 1150HPACDrillingMotor, 1.Model00GEK-5GEB2291696DGEK1150-91696DHPAC DrillingMotor,Model5GEB223.125 BearingNutSpannerWrench9945228 CEDummyBearingCap41C689896 DEBearingGuide 1150HPACDrillingMotor,ModelGEK-5GEB2291696DDEDummyBearingCap6796493P3 HubInstallationAdvanceGage 70NWREV091030621--98,098,2MGC/DGKGMDPABGAS