Ride Finance Panel
1
2
3
4
5
Ride Vehicles Panel
4
39
56
1 27 8
1.Admission Price – Click the arrows to adjust. Note: Some scenarios do not permit ticket prices to be adjusted.
2.Projected Hourly Income – Shows potential income per
3.Hourly Costs – Shows cost per real- world hour.
4.Projected Profit – Shows projected profit per
5.Lifetime Profit
1. Color Selector for Beam | 6. Car Type – Allows the user to select |
| the design of the ride’s car. |
2.Color Selector for Supports
3. | 7. | Color Selector for Car Exterior |
Color Selector for Track | Color Selector for Car Trim | |
4. | 8. | |
Ride Capacity | Color Selector for Seats | |
| 9. |
5.Recolor Track to a Single Color – Reset all track color choices to a single color.
Ride Test Results Panel
1
2
1. | Test Results Category – Click arrow to 2. | Rating Results List – Shows rating |
| select Basic or Advanced (not available | categories for the ride (these values |
| on all rides). | remain blank if the ride has not |
|
| undergone testing). |
50 | 51 |