John Wardley: Construction
Where are components made, what type of crew generally
installs a coaster, and how long does it take to
build a new coaster?
Although the chosen manufacturer will operate from one base, frequently the
components – track, support structure, cars, brakes, lifts, control
systems etc. etc. – will be fabricated in many different locations around the world, and only come together for the first time on site. Civil engineers will prepare the foundation, steel erectors will put up the structure and track, and mechanical and systems engineers will install and commission the ride.
From initial concept to opening day can take up to three years.
BUILDING A ROLLER COASTER
The Coaster Builder Toolbox
Open the Coaster Builder Toolbox by clicking on the Construction Button of the Ride Control Panel. You’ll notice a good selection of track pieces are available for constructing your coaster or other track ride.These vary from ride to ride.The
Coaster Building Checklist — the Essentials
Here are a few tips to get you started on the right path to building a successful coaster.
Prepare the Terrain
Use the tool that Flattens Terrain In Increments For Rides And Scenery to prepare the land around where you plan to put the ride entrance and exit.This will ensure that you’ll be able to build a path to the ride. If the
Make Your Boarding Station Long Enough
If you increase the number of cars per train, the boarding station must be longer than a single track length. As a rule of thumb, your boarding station should be at least three
Start with a Lift Chain
Most rides require you to add a lift chain to the entire incline at the beginning of the ride. As a pre- caution, extend the lift chain to the first level
Test While Building
After you’ve created your first incline, change the ride status from Closed to Test.This will cause the ride to run as you build it so you can see the results of each new section of the track you build as you build it, and will help you identify ride failures quickly.
Change the Banking Setting for Curved Track Pieces
You’ll manage the
84 | 85 |