Sterling GG-75, GG-90, GG-60, GG-45, GG-120, GG-30, GG-105 Vertically VENTED, Category III

Page 22

STANDARD COMBUSTION

VERTICALLY VENTED, CATEGORY III – Figure 17 & 19

Observe the following precautions when venting the unit:

1.Use flue pipe of the same size as the flue connection(s) on the gas unit heater, 4" (102mm). All heaters must be vented with a single or double wall pipe listed for positive pressure vent systems.

2.Each unit must have an individual vent pipe and vent terminal. Unit MUST NOT be connected to other vent systems or to a chimney.

3.Category III units are limited to a maximum of 40 feet (12.19m) equivalent length of vent pipe. Equivalent length is the total length of straight sections PLUS 5 feet (1.5m) for each 90 degree elbow and 2.5 feet (.75m) for each 45 degree elbow.

4.The top of the vent pipe should extend at least 2 feet (0.61m) above the highest point on the roof. Consideration should be made for anticipated snow depth. Install an Amerivent Americap or Metalbestos vent cap over the vent opening. Slope horizontal runs upward from the gas unit heater at least 1/4-inch per foot (21mm/m) minimum. Horizontal portions of the venting system shall be supported at minimum intervals of 4 feet (1.2m) (in Canada, support at 3 feet (1m) minimum intervals). (See Figures 15, 17 and 19)

5.Seal all vent pipe joints and seams to prevent leakage. Use General Electric RTV-108, Dow- Corning RTV-732, or equivalent silicone sealant with a tempera- ture rating of 500 deg. F, or 3M #425 aluminum foil tape (or equivalent).

6.Avoid running vent pipe through unheated spaces. When this cannot be avoided, insulate the pipe to prevent condensation of moisture on the walls of the pipe.

Figure 15

22

Image 22
Contents Tubular GAS Fired Direct Spark Propeller Unit Heaters Receiving InstructionsTable of Contents DescriptionGeneral Safety Information Performance DATA† Page Installation Installation Pipe Sizing GAS PipingGas Pipe Size Pipe Installation Gas Piping RequirementsThermostat Wiring and Location Electrical ConnectionsElectrical Connections Electrical Connections Electrical Connections Electrical Connections Electrical Connections Venting Additional Requirements for Canadian InstallationsVenting into an unlined masonry chimney is prohibited Venting General Guidelines Venting CategoriesStandard Combustion Vertically VENTED, Category I FigureCategory I Horizontal Venting Requirements Vent Support Horizontally VENTED, Category III Figure Vertically VENTED, Category III Type B Draft Hood Connector Venting Venting Carbon Monoxide Separarted Combustion Installation Venting CategoryCombustion AIR Venting and Piping Exhaust VentingConcentric Vent Box Dimensions Separated CombustionConcentric Vent Installation Horizontal Intake/Vent Installation Vertical Termination AIR Inlet CollarExhaust AIR Collar Horizontal TerminationExplanation of Controls See Figure OperationShut Down Main Burner Orifice Schedule Primary AIR Shutter AdjustmentGAS Input Rate Tubular Unit Heater High Altitude DerationPeriodic Service Never over oil the motor or premature failure may occurTubular Propeller Troubleshooting Guide Symptoms Possible Causes Corrective ActionRealign power venter wheel Check operation of switch, did the switch LED Status Indicates CHECK/REPAIR Pattern Status CHECK/REPAIR ItemDescription Propeller Parts HOW to Order Replacement Parts 5 Capacity CA 14, 15 + Accessories ASUnit Type UT Supply Voltage SVPRE-INSPECTION Information With power and gas offWith power and gas on GeneralHvac Products