Sterling GG-45, GG-90, GG-75, GG-60, GG-120 Operation, Explanation of Controls See Figure, Shut Down

Page 31

OPERATION

POWER VENTED PROPELLER UNITS

DIRECT SPARK IGNITION

EXPLANATION OF CONTROLS (See Figure 25):

1.Each Unit Heater comes equipped with a power vent system that consists of a power venter motor and blower, pressure switch, and sealed flue collector in place of the conventional draft diverter.

2.The power venter motor is energized by the room thermostat through the integrated control board when a demand for heat is sensed. The pressure switch measures the flow through the vent system and energizes the direct spark ignition system beginning the pre-purge timing when the flow is correct.

The pressure switch MUST NOT be bypassed. The unit MUST NOT be fired unless the power venter is operating. An unsafe condition could result.

3.The direct ignition system consists of an ignition control module and a gas valve. When the pre-purge period ends, the spark ignition system is energized, and the gas valve opens to supply gas to the burner. When the thermostat is satisfied, the vent system is de-energized and the valve closes to stop the flow of gas to the unit.

4.The limit switch interrupts the flow of electric current to the control board, interrupting the flow of gas to the gas valve if the unit heater becomes overheated.

5.The flame roll-out switch interrupts the flow of electric current to the control board, interrupting the flow of gas to the unit heater in the event of sustained flame roll-out from the burner area. If this switch trips, DETERMINE AND CORRECT THE CAUSE of the flame roll-out.

6.Once the thermostat is satisfi ed, or the limit switch interrupts the fl ow of electric current to the control board, the unit will begin a post-purge period. When the post-purge period ends, the power venter motor is de-energized.

7.The fan operation is delayed 30 seconds once the thermostat is closed, and continues operation for 30 seconds after the thermostat opens. The start-up fan delay must not exceed 30 seconds from a cold start.

8.The wall thermostat, supplied optionally, is a temperature sensitive switch that operates the vent system and ignition system to control the temperature of the space being heated. The thermostat must be mounted on a vertical, vibration-free surface free from air currents and in accordance with the furnished instructions (also refer to Electrical Section).

START-UP (Also refer to lighting instruction plate equipped on the unit)

1.Open the manual gas valve in the gas supply line to the unit heater with union connection loose, purge air from the gas line. Tighten the union and check for leaks.

Never use an open flame to detect gas leaks. Explosive conditions may exist which could result in personal injury or death.

2.Open the manual valve on the unit heater.

3.Turn ON the electrical power.

4.The unit should be under the control of the thermostat. Turn the thermostat to the highest point and determine that the power venter motor starts and the burner ignite. Turn the thermostat to the lowest point and determine that the power venter motor shuts off and the burner is extinguished.

5.Turn the thermostat to the desired position.

6.See Gas Input Rate and Adjustments sections.

SHUT DOWN

1.Turn the valve selector lever to the “OFF” position.

2.Turn off the electricity.

3.To relight, follow “start-up” instructions.

See Figure 25 for parts/identification.

Figure 25

31

Image 31
Contents Receiving Instructions Tubular GAS Fired Direct Spark Propeller Unit HeatersDescription Table of ContentsGeneral Safety Information Performance DATA† Page Installation Installation Pipe Sizing GAS PipingGas Pipe Size Gas Piping Requirements Pipe InstallationElectrical Connections Thermostat Wiring and LocationElectrical Connections Electrical Connections Electrical Connections Electrical Connections Electrical Connections Venting Additional Requirements for Canadian InstallationsVenting into an unlined masonry chimney is prohibited Venting Categories Venting General GuidelinesVertically VENTED, Category I Figure Standard CombustionCategory I Horizontal Venting Requirements Vent Support Horizontally VENTED, Category III Figure Vertically VENTED, Category III Type B Draft Hood Connector Venting Venting Exhaust Venting Separarted Combustion Installation Venting CategoryCombustion AIR Venting and Piping Carbon MonoxideSeparated Combustion Concentric Vent Box DimensionsConcentric Vent Installation Horizontal Intake/Vent Installation Horizontal Termination AIR Inlet CollarExhaust AIR Collar Vertical TerminationExplanation of Controls See Figure OperationShut Down Tubular Unit Heater High Altitude Deration Primary AIR Shutter AdjustmentGAS Input Rate Main Burner Orifice ScheduleNever over oil the motor or premature failure may occur Periodic ServiceSymptoms Possible Causes Corrective Action Tubular Propeller Troubleshooting GuideRealign power venter wheel Check operation of switch, did the switch LED Status Indicates CHECK/REPAIR Pattern Status CHECK/REPAIR ItemDescription Propeller Parts HOW to Order Replacement Parts Supply Voltage SV 14, 15 + Accessories ASUnit Type UT 5 Capacity CAGeneral With power and gas offWith power and gas on PRE-INSPECTION InformationHvac Products