18CHAPTER 2: INSTALLING THE SERVER LOAD BALANCER
Package Contents Your shipping container should contain the following items:
■Server Load Balancer (3C11620)
or Server Load Balancer Plus (3C11621)
■User Guide (this guide)
■Power Cord
■2 x mounting brackets
■6 x screws
■4 x rubber feet
Choosing a Suitable The Server Load Balancer is suited for use where it can be mounted in a
Sitestandard
CAUTION: Ensure that the ventilation holes are not obstructed.
When deciding where to position the Server Load Balancer, ensure that:
■Cabling is located away from sources of electrical noise such as radios, transmitters and broadband amplifiers.
■Cabling is located away from power lines and fluorescent lighting fixtures
■The Server Load Balancer is accessible and cables can be connected easily.
■Water or moisture cannot enter the case of the Server Load Balancer.
■
■The air is as free from dust as possible.
■No more than four Server Load Balancer units are placed on top of one another, if the units are
■Temperature operating limits are not exceeded. It is recommended that the unit is installed in a clean, air conditioned environment.
■Ensure there is adequate clearance at the front of the unit to ensure that the fibers are not damaged as they have a restricted bend radius.