Thermo Products ome-72d36 service manual Electrical Wiring

Page 23

All installations and services must be performed by qualified service personnel.

Figure 7.

J. ELECTRICAL WIRING

All electrical wiring must be installed in strict accordance with local ordinances and codes. In the absence of local ordinances and codes, all electrical wiring must conform to the requirements of the National Electric Code, ANSI/NFPA 70-1999, or latest edition.

21

Image 23
Contents OIL-FIRED Furnace Do not RUN the OIL Pump DRY for More than Five Minutes Safety SectionPage Page Page Page Table of Contents Section Beginning Page Models OME Burner Data III. Furnace Specifications ModelBlower Data Furnace Location IV. Installation Roof JackStandard Chimney Base Installation Page Page Page Closet Installation Alcove InstallationCombustion AIR Page Page Fuel Piping Page Electrical Wiring AWG Blower Controller Information for PSC Motor Terminal Definitions & Field WiringInputs Operating Modes Page Diagnostic Features PSC Trouble ShootingWiring Diagram Burner Operation and Adjustment Burner InstallationPage Page Burner Combustion Parameters Flue GAS Combustion AnalysisPage Troubleshooting Flowchart Correct wire connections Page Does the burner stay Yes Heat Exchanger Cleaning Instructions CAD Cell Checkout ProcedurePage Extended Shutdown Cleaning or Replacing Flue PipesVI. User Information Section Inspection Areas Component LocationsContact Information Installation / Service Filter Location and CleaningAppendix A. Replacement Parts List