Thermo Products ome-72d36 service manual PSC Trouble Shooting, Diagnostic Features

Page 29

All installations and services must be performed by qualified service personnel.

 

DIP SWITCH 2 SECTION STATE

 

BLOWER DELAY TIMES

 

 

 

 

 

 

 

 

 

 

 

 

 

1

2

3

4

 

ON - SEC

OFF - MIN

 

 

 

 

 

 

 

 

 

 

 

 

 

OFF

OFF

 

 

 

30

 

 

 

 

 

 

 

 

 

 

 

 

FACTORY

 

ON

OFF

 

 

 

60

 

 

SETTING

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

OFF

ON

 

 

 

120

 

 

 

 

 

 

 

 

 

 

 

 

 

 

ON

ON

 

 

 

240

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

OFF

OFF

 

 

2

 

 

 

 

 

 

 

 

 

 

 

FACTORY

 

 

 

ON

OFF

 

 

4

 

SETTING

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

OFF

ON

 

 

6

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

ON

ON

 

 

8

 

 

 

 

 

 

 

 

 

 

Table 11: ON and OFF Blower Delay Time Switch Settings

Blower On and Off Delays

Four Heat blower on and four blower off delays are selected by two dip switches for each function. Refer to Table 11 for specific delay values.

PSC TROUBLE SHOOTING

DIAGNOSTIC FEATURES

The control board is equipped with 4 green Input Status LEDs and 1 red Board Status LED. These are intended to provide a quick view into furnace performance without requiring a voltmeter.

The green Input Status LEDs are driven by the “Y”, “W”, “G”, and “DEHUM” inputs and are located directly below those inputs. They will light to indicate the presence of these signals.

The red Board Status LED has two functions:

It will light when the board recognizes a valid input signal and will stay lit until all valid signals are removed. This is intended to show that the board is functioning and able to respond to input signals.

It will flash rapidly while 120VAC is missing from the LIMIT switch. This is intended to give a quick visual indication of the High Limit switch.

27

Image 29
Contents OIL-FIRED Furnace Do not RUN the OIL Pump DRY for More than Five Minutes Safety SectionPage Page Page Page Table of Contents Section Beginning Page Models OME Burner Data III. Furnace Specifications ModelBlower Data Furnace Location IV. Installation Roof JackStandard Chimney Base Installation Page Page Page Closet Installation Alcove InstallationCombustion AIR Page Page Fuel Piping Page Electrical Wiring AWG Blower Controller Information for PSC Motor Terminal Definitions & Field WiringInputs Operating Modes Page Diagnostic Features PSC Trouble ShootingWiring Diagram Burner Operation and Adjustment Burner InstallationPage Page Burner Combustion Parameters Flue GAS Combustion AnalysisPage Troubleshooting Flowchart Correct wire connections Page Does the burner stay Yes Heat Exchanger Cleaning Instructions CAD Cell Checkout ProcedurePage Extended Shutdown Cleaning or Replacing Flue PipesVI. User Information Section Inspection Areas Component LocationsContact Information Installation / Service Filter Location and CleaningAppendix A. Replacement Parts List