SPX Cooling Technologies 98-1514E user manual Marley AV Cooling Tower

Page 1

/ Marley AV Cooling Tower /

User Manual 98-1514E

Image 1
Contents Marley AV Cooling Tower Contents Preparation Safety FirstTower Location Tower Shipment Receiving and HoistingReceiving Tower Hoisting TowerTower Installation InstallationInstallation When using a starter Motor WiringWhen using a VFD When using a two-speedstarterMechanical Equipment Installation Tower Start-Up OperationWater System Operation General Tower OperationAcceleration time of 30 seconds per hour Wintertime Operation Operation Intermittent Wintertime Operation Maintaining Water Quality Tower Cleaning, Water Treatment and BlowdownCooling Tower Cleaning MaintenanceBlowdown Belt Tensioning Sheave Alignment Bushing Fastener Torque ValuesSchedule of Tower Maintenance Maintenance Seasonal Shutdown Instructions Prolonged Shutdown SPX Cooling Technologies’ ServicesMaintenance Schedule Trouble Cause Remedy TroubleshootingRepresentative Additional Information Page Manual 98-1514E