SPX Cooling Technologies 98-1514E user manual Additional Information

Page 30

Additional Information

Increased load requirements: AV Series towers are designed such that cells of either equal or unequal capacity can be added in the future. This allows you to compensate for the load increases that normally occur with the replacement or addition of production equipment—and still retain continuity with respect to your cooling tower system.

Tower rebuilding: SPX Cooling Technologies routinely rebuilds and up- grades cooling towers of all materials and manufacture. If your tower ever reaches the limit of its service life, we recommend that you investigate the cost of rebuilding before you routinely order a new replacement tower.

Each AV tower includes a document package containing general orientation drawings, a Field Installation Manual, and tower component user manuals. These documents contain important information relating to safe installation and operation of the cooling tower. Field installation is always required for piping inlets and piping outlets. The fan guard on larger models an some optional accessories, such as valves, handrails, ladders and safety cages may also require field installation. If installation details are not covered in the Field Installation Manual a separate instal- lation drawing for each purchased option is included in the document package. If you have purchased an option and can’t find the appropriate installation drawing, contact your local Marley sales representative before proceeding.

For complete parts and service assistance, contact the Marley sales rep- resentative in your area. If you need help locating the office nearest you, please phone 800 462 7539 or check the internet at spxcooling.com.

30

Image 30
Contents Marley AV Cooling Tower Contents Safety First PreparationTower Location Receiving Tower Receiving and HoistingTower Shipment Hoisting TowerInstallation Tower InstallationInstallation Motor Wiring When using a starterWhen using a two-speedstarter When using a VFDMechanical Equipment Installation Operation Tower Start-UpWater System Operation Tower Operation GeneralAcceleration time of 30 seconds per hour Wintertime Operation Operation Intermittent Wintertime Operation Tower Cleaning, Water Treatment and Blowdown Maintaining Water QualityMaintenance Cooling Tower CleaningBlowdown Belt Tensioning Bushing Fastener Torque Values Sheave AlignmentSchedule of Tower Maintenance Maintenance Seasonal Shutdown Instructions SPX Cooling Technologies’ Services Prolonged ShutdownMaintenance Schedule Troubleshooting Trouble Cause RemedyRepresentative Additional Information Page Manual 98-1514E