Toshiba RAV-SP240AT2-UL installation manual Drain nipple, 5pcs

Page 12

Outdoor Unit

Installation Manual

3)Place unit on stand. Make sure it is level and fasten securely to the stand.

As shown in the figure below, install the foundation and vibration-proof rubber pads to directly support the bottom surface of the fixing leg that is in contact with the bottom plate of the outdoor unit.

When installing the foundation for an outdoor unit with downward piping, consider the piping work.

GOOD

Mounting leg

Foundation

GOOD

Bottom plate

of outdoor unit

Foundation

Support the bottom surface of the mounting leg that is in contact with and underneath the bottom plate of the outdoor unit.

When water is to be drained through the drain hose, attach the following drain nipple and waterproof rubber cap, and use the drain hose (Inner diameter: 0.6” (16 mm)) sold on the market. Also seal the screws securely with silicone material, etc., to prevent water from leaking.

Some conditions may cause condensation or dripping of water.

When collectively draining discharged water completely, use a drain pan.

Drain nipple

Waterproof rubber cap

(5pcs.)

Drain nipple

Waterproof rubber cap

If only the end of the mounting leg is supported, it may deform.

Foundation

NO GOOD

 

 

Do not support

 

 

 

the outdoor unit

 

 

 

only with the

 

 

 

mounting leg.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

If a heating operation is to be continuously performed for a long time under the condition that the outdoor temperature is 32 °F (0 °C) or lower, draining defrosted water may be difficult due to the bottom plate freezing, resulting in trouble with the cabinet or fan.

11-EN

– 11 –

Image 12
Contents Installation manual Contents Dimension Accessory Parts Part name ’ty Shape Usage Installation manualHand this directly to the customer System Requirements „ Piping Field suppliedPrecautions for Safety Be sure to ground the equipmentEquipment Damage Hazard Installation of NEW Refrigerant AIR Conditioner „ Required Tools/Equipment and Precautions for UseNew Refrigerant Air Conditioner Installation Tools/equipment Use„ Installation Location Do not install the outdoor unit in the following locationExample „Required Clearances Unit in mmBarrier at rear side Barrier in front Upper side is free Above unit is free„ Installation of Outdoor Unit Standard installationInstallation Manual Barriers in front and back of unitDrain nipple 5pcsRefrigerant Piping FlaringProjection margin in flaring B Unit in mm Rigid Clutch type Flaring diameter size a Unit in mm„ Tightening of Flare Connections Do not apply refrigerant oil to the flared surfaceValve at liquid side Outer diameter of copper pipe Tightening torque„ Field wiring Electrical Connections„ Wiring Attach the front pipe cover with 4 screws Using Vacuum Pump Evacuate and Dehydrate the SystemDeep Vacuum Method Triple Evacuation MethodOpen service valves Valve handling precautionsFinal Tubing Check Liquid side11PERIODIC Maintenance Finishing10TEST RUN 12TROUBLESHOOTING Verifying Fault code status Outdoor control boardD800 D801 D802 D803 D804 D805 14POWER Save Procedure13UNIT Pump Down EH99865401

RAV-SP240AT2-UL specifications

The Toshiba RAV-SP240AT2-UL is a state-of-the-art air conditioning unit that showcases Toshiba's commitment to energy efficiency, innovation, and comfort. Designed primarily for commercial use, it stands out as an ideal solution for businesses that require a reliable and effective climate control system.

One of the main features of the RAV-SP240AT2-UL is its powerful 24,000 BTU cooling capacity, which allows it to effectively cool larger spaces. This unit functions efficiently even in extreme weather conditions, providing optimal performance regardless of outside temperatures. The RAV-SP240AT2-UL also boasts a heating capacity, making it a versatile option for year-round climate control.

Energy efficiency is a significant characteristic of this model, as it comes equipped with an advanced inverter technology. This technology allows the unit to adjust its cooling and heating output according to the specific requirements of the space. As a result, users can expect lower energy consumption, reduced electricity bills, and a lower carbon footprint. The RAV-SP240AT2-UL has a high Energy Efficiency Ratio (EER) rating that further underscores its energy-saving capabilities.

In terms of installation, the RAV-SP240AT2-UL is designed for easy integration. Its compact size and lightweight design make it suitable for various commercial settings, including offices, retail spaces, and restaurants. The unit can be installed in both horizontal and vertical configurations, providing flexibility to meet the unique layout of any building.

The Toshiba RAV-SP240AT2-UL also includes advanced filtration systems that enhance indoor air quality. Its multi-stage air filtration process removes dust, allergens, and other particulates, ensuring a healthier environment for occupants. Additionally, the unit operates at a low noise level, providing a quiet atmosphere that enhances the comfort of any space.

Another notable technology featured in the RAV-SP240AT2-UL is the Smart Control system, which allows users to monitor and manage their air conditioning remotely. This feature adds convenience and flexibility, enabling businesses to optimize their energy use and maintain a comfortable environment, even from a distance.

Overall, the Toshiba RAV-SP240AT2-UL is a robust and efficient air conditioning solution tailored for commercial spaces. With its blend of power, energy efficiency, and advanced technology, it ensures an optimal climate control experience while promoting sustainability.