Toshiba RAV-SP240AT2-UL Final Tubing Check, Open service valves, Liquid side, Gas side

Page 19

Outdoor Unit

Triple Evacuation Method chart

EVACUATE

BREAK VACUUM WITH DRY NITROGEN

WAIT

EVACUATE

BREAK VACUUM WITH DRY NITROGEN

WAIT

EVACUATE

CHECK FOR TIGHT, DRY SYSTEM

(IF IT HOLDS DEEP VACCUM)

RELEASE CHARGE INTO SYSTEM

Final Tubing Check

IMPORTANT:

Check to be certain factory tubing on both indoor and outdoor unit has not shifted during shipment. Ensure tubes are not rubbing against each other or any sheet metal. Pay close attention to feeder rubes, making sure wire ties on feeder tubes are secure and tight.

Installation Manual

Open service valves

Open or close the valve.

Liquid side

Open the valve with a 4 mm hexagon wrench.

Gas side

Valve unit

Using a straight blade screwdriver, turn it 90° counter clockwise until the valve is fully open

(against the stop).

Charge orifice

Flare nut

 

Handle position

Fully closed

Fully opened

 

Stop pin

Main stopper

While the valve is fully opened, after the screwdriver has reached the stopper, do not apply torque exceeding 4 ft•lbs (5 N•m). Applying excessive torque may damage the valve.

Valve handling precautions

Open the valve stem until it reaches the stop. It is unnecessary to apply further force.

Securely tighten the cap with a torque wrench.

Cap tightening torque

Valve size

Ø3/8” (9.5 mm)

24 - 31 ft•lbs (33 - 42 N•m)

 

 

Ø5/8” (15.9 mm)

15 - 18 ft•lbs (20 - 25 N•m)

 

 

 

 

Charge port

10 - 13 ft•lbs (14 - 18 N•m)

 

 

 

EN

– 18 –

18-EN

Image 19
Contents Installation manual Contents Dimension Part name ’ty Shape Usage Installation manual Accessory PartsHand this directly to the customer „ Piping Field supplied System RequirementsBe sure to ground the equipment Precautions for SafetyEquipment Damage Hazard Tools/equipment Use Installation of NEW Refrigerant AIR Conditioner„ Required Tools/Equipment and Precautions for Use New Refrigerant Air Conditioner InstallationDo not install the outdoor unit in the following location „ Installation LocationExample Upper side is free Above unit is free „Required ClearancesUnit in mm Barrier at rear side Barrier in frontBarriers in front and back of unit „ Installation of Outdoor UnitStandard installation Installation Manual5pcs Drain nippleFlaring diameter size a Unit in mm Refrigerant PipingFlaring Projection margin in flaring B Unit in mm Rigid Clutch typeOuter diameter of copper pipe Tightening torque „ Tightening of Flare ConnectionsDo not apply refrigerant oil to the flared surface Valve at liquid sideElectrical Connections „ Field wiring„ Wiring Attach the front pipe cover with 4 screws Triple Evacuation Method Using Vacuum PumpEvacuate and Dehydrate the System Deep Vacuum MethodLiquid side Open service valvesValve handling precautions Final Tubing CheckFinishing 11PERIODIC Maintenance10TEST RUN Verifying Fault code status Outdoor control board 12TROUBLESHOOTINGD800 D801 D802 D803 D804 D805 Procedure 14POWER Save13UNIT Pump Down EH99865401

RAV-SP240AT2-UL specifications

The Toshiba RAV-SP240AT2-UL is a state-of-the-art air conditioning unit that showcases Toshiba's commitment to energy efficiency, innovation, and comfort. Designed primarily for commercial use, it stands out as an ideal solution for businesses that require a reliable and effective climate control system.

One of the main features of the RAV-SP240AT2-UL is its powerful 24,000 BTU cooling capacity, which allows it to effectively cool larger spaces. This unit functions efficiently even in extreme weather conditions, providing optimal performance regardless of outside temperatures. The RAV-SP240AT2-UL also boasts a heating capacity, making it a versatile option for year-round climate control.

Energy efficiency is a significant characteristic of this model, as it comes equipped with an advanced inverter technology. This technology allows the unit to adjust its cooling and heating output according to the specific requirements of the space. As a result, users can expect lower energy consumption, reduced electricity bills, and a lower carbon footprint. The RAV-SP240AT2-UL has a high Energy Efficiency Ratio (EER) rating that further underscores its energy-saving capabilities.

In terms of installation, the RAV-SP240AT2-UL is designed for easy integration. Its compact size and lightweight design make it suitable for various commercial settings, including offices, retail spaces, and restaurants. The unit can be installed in both horizontal and vertical configurations, providing flexibility to meet the unique layout of any building.

The Toshiba RAV-SP240AT2-UL also includes advanced filtration systems that enhance indoor air quality. Its multi-stage air filtration process removes dust, allergens, and other particulates, ensuring a healthier environment for occupants. Additionally, the unit operates at a low noise level, providing a quiet atmosphere that enhances the comfort of any space.

Another notable technology featured in the RAV-SP240AT2-UL is the Smart Control system, which allows users to monitor and manage their air conditioning remotely. This feature adds convenience and flexibility, enabling businesses to optimize their energy use and maintain a comfortable environment, even from a distance.

Overall, the Toshiba RAV-SP240AT2-UL is a robust and efficient air conditioning solution tailored for commercial spaces. With its blend of power, energy efficiency, and advanced technology, it ensures an optimal climate control experience while promoting sustainability.