Lochinvar F0600187510 service manual Sequence of Operation

Page 51

Installation and Service Manual

ENERGY SAVING

RECOMMENDATIONS

1.Keep the pool covered when not in use. This will cut heating cost, reduce water evaporation, conserve chemicals and reduce load on the filtering system.

2.Reduce pool thermostat to 78°F or lower.

3.Use an accurate pool thermometer to monitor water temperature.

4.Use a time clock to start filter pump no earlier than 6 a.m. during pool season. This is the time when nightly heat loss stabilizes.

5.Turn the pool heater “OFF” and drain during long periods when the pool will not be used (winter, vacations, etc).

6.Follow a regular program of preventative maintenance for your pool heater each new swimming season. Check heat exchanger, controls, burners and operation of the pool heater.

7.For pools used only on weekends, the thermostat may be set lower than 78ºF during the week. Lower setting to a range that can be easily achieved in one day's operation of the pool heater.

SEQUENCE OF OPERATION

OVERVIEW

This sequence of operation can be considered the order of events in sequential order that occur after the pool heater has received a call for heat. The process begins with 120VAC power entering the pool heater and ends with the pool heater going into an idle state after completion of a successful call for heat. Note: The following descriptions do not include remotely connected devices that may be connected to the pool heater. Refer to the wiring diagram for actual point to point wiring connections that show power delivery.

1.Place the POWER switch in the “ON” position.

2.120VAC power is supplied to the control transformer along with L1 and F1 on the ignition module.

3.24VAC is supplied to the adjustable high limit control.

4.24VAC is then supplied to the 110°F mixed water limit control and onto the 200°F fixed limit control.

5.If equipped, 24VAC is supplied to a low water cut-off and then to the optional high and low gas pressure switches.

6.24VAC is supplied to the terminal strip and onto the switching contacts of the digital temperature control.

7.The digital temperature control will then call for heat.

8.24VAC is then supplied to the water pressure switch and the flow switch (if equipped).

9.24VAC is then supplied to the TH terminals on the ignition module.

10.As power is applied to the TH terminals on the ignition module, 120VAC is switched from the F2 terminal to start the combustion air fan(s).

11.24VAC is supplied to the C terminal of the air pressure switch. As the low air switch makes, power is supplied to the optional louver/venter enable contact relay.

12.24VAC is then supplied to the PS terminals on the ignition module.

13.The combustion air fan operates for the pre-purge period.

14.At the end of the pre-purge period, 120VAC is applied to the hot surface igniter and the trial for ignition light.

15.The hot surface igniter proves 1800°F (982°C) ignition temperature by the current draw through the ignition module.

16.The ignition module supplies voltage to the MV terminals onto the gas valve(s).

17.The first stage gas valve opens and supplies gas to the orifice inlet to pre-mix.

18.The gas/air mixture is forced into the burner and out of the burner ports under pressure.

19.The hot surface igniter lights the gas/air mixture and then serves as a flame sensor to prove main burner flame by rectification.

20.Burners for all stages are now firing at rated input on the 500,000 through 750,000 Btu/hr models.

21.On the 990,000 through 2,070,000 Btu/hr models approximately 50% of the input is now energized.

22.24VAC is supplied to a digital temperature control which times out and then energizes the next 50% of the gas valves.

23.The remaining gas valves open and supply gas to the orifice inlet to pre-mix.

24.The gas/air mixture is forced out of the burner ports and light by carry-over from the burners currently firing.

25.The heater is now firing at full rated input.

HEAT TRANSFER PROCESS

26.Heated products of combustion pass over the heat exchanger transferring heat to the water.

27.The rate of flue product movement is controlled by “V” baffles on the heat exchanger to maximize heat transfer.

28.Flue products pass into the flue collector and are exhausted from the unit.

END OF SEQUENCE

29.Set point temperature for the pool water is satisfied.

30.Power to the gas valves is turned “OFF”.

31.The combustion air fan runs for a 30 second post purge timing and turns “OFF”.

32.The unit is now in a Standby Mode waiting for the next “Call for Heat”.

51

Image 51
Contents Do not try to light any appliance GAS Heaters for Commercial Pool ApplicationsCommercial Pool Heaters General Product Information Commercial Pool Heaters Product Identification Base for Combustible Floors Clearances from Combustible ConstructionCombustion Air Filter CFK3302CFK3303 CFK3304Combustion Air Options InstallationExhaust Fans Outside Combustion Air, Using DuctsGeneral Information Venting SupportVertical Vent Termination Clearances and Location Table B Sidewall Vent Termination Clearances and LocationCombustion Air Inlet Piping Length of Air Inlet PipeSidewall Air Inlet Combined Air Inlet Points Vertical Rooftop Air InletVent System Options Conventional Negative Draft VentingNegative Draft Common Venting Systems Flue Outlet PipingMasonry Chimney Installations Vertical DirectAire VentingInspection of a Masonry Chimney Vent Kits Venting of Flue ProductsSidewall Venting Sidewall Fan Sidewall Venting TerminationSidewall Venting Without Fan Masonry Chimney Installation TABLE-E Horizontal DirectAire VentingDirect Venting Horizontal DV Venting Termination Flue Pipe MaterialsCombustion Air Inlet Piping Sealing Type-B Doublewall Vent Pipe or Galvanized Vent Pipe Connecting the Air Inlet Pipe to the Pool HeaterLength of Air Inlet Pipe Air Inlet Piping MaterialsVertical Rooftop Air Inlet Combined Combustion Air Inlet PointsOutdoor Vent/Air Inlet Location Outdoor Installation VentingVertical Combustion Air Inlet Clearances Horizontal Combustion Air Inlet ClearancesOutdoor Vent Cap Kit Combustion Air Fan Adjustment for startup3-Way Valve Cover Installation Gas Pressure TestConnecting Gas Piping to the Pool Heater Gas PipingGas Train and Controls TABLE-J Combination Gas ValvesVenting of Combination Gas Valves Checking Gas Supply PressureTable K Multiple Unit Installations Gas Supply Pipe SizingTo adjust to the proper manifold gas pressure Gas Manifold Pressure AdjustmentPumped Automatic Bypass Auxiliary Mixed Water Limit ControlWay Valve Cover Heater is Within 15 Feet of Pool Piping Heaters are within 15 feet Perpendicular of Pool Piping Water Flow Switch Relief ValveAutomatic Chlorinator and Chemical Feeders Pump Purge Delay Option Service Indicator OptionWay Automatic Bypass Valve Wiring TABLE-M Terminal Strip Connection OptionsLighting Instructions OperationPre-Start Checklist To Turn Off Gas To Pool HeaterStarting the Filter System Operation Error Messages Displayed by Temperature Controller Programming ModeIgnition Module Lockout Functions Diagnostic Status IndicationHot Surface Igniter and Ignition Control Module Hot Surface Ignition Control ModuleAccess to Internal Control Panel TABLE-NIgnition and Control Timings TABLE-O Water ChemistryTABLE-Q Pipe Size RequirementsHeat Exchanger High Water Temperature Limit ControlCirculating Pump Minimum Pump PerformanceBurner Flames Flue Gas Passageways Cleaning ProceduresAppliance Area Water Circulating PumpCombustion and Ventilation Air Burner Removal and CleaningHeat Exchanger Cleaning ElectricalSet-Up Procedure Adjusting Differential Air PressureFan Cleaning Combustion Air Fan AdjustmentAdjustment Procedure Servicing Hot Surface Igniter and Ignition ModuleIgnition System Checkout Sequence of Operation Glossary Igniter WARM-UP and Proving Wiring BOX Connections Main Unit Connections Ladder Diagram Control BOX Connections Commercial Pool Heaters Appendix a Appendix B

F0600187510 specifications

The Lochinvar F0600187510 stands out as a premium combination boiler that caters to the heating and hot water needs of residential properties. Known for its energy efficiency and advanced technology, this model is ideal for homeowners seeking both comfort and cost savings.

One of the primary features of the Lochinvar F0600187510 is its exceptional energy efficiency. With an impressive AFUE (Annual Fuel Utilization Efficiency) rating, this boiler redefines performance standards, effectively converting a high percentage of the energy it consumes into usable heat. This not only helps in reducing energy bills but also contributes to lower carbon emissions, making it an environmentally responsible choice.

The F0600187510 is equipped with Lochinvar's advanced control system, which allows for precise temperature regulation. This system includes a user-friendly digital display, enabling homeowners to easily adjust settings for their specific heating and hot water requirements. The boiler also offers weather compensation features that optimize performance based on outdoor temperatures, ensuring maximum efficiency throughout the year.

In terms of hot water production, this model features a built-in indirect water heater design, which provides an abundant supply of domestic hot water on demand. This is ideal for households with high hot water usage, as the system can deliver multiple gallons per minute without interruption.

Moreover, the compact design of the Lochinvar F0600187510 allows for flexible installation options, making it suitable for various settings, including tight spaces. Its robust construction ensures durability and reliability, giving homeowners peace of mind regarding long-term performance.

Safety is another significant characteristic of this combination boiler. It comes with multiple built-in safety features, including flame detection, pressure sensors, and overheat protection, ensuring the system operates securely and efficiently.

Finally, the Lochinvar F0600187510 is backed by a solid warranty, providing homeowners with additional assurance of quality and support. Overall, this boiler represents a harmonious blend of innovative technology, efficiency, and reliability, making it a top choice for modern residential heating and hot water solutions.