Lochinvar 497 - 2067 service manual Combustion and ventilation air

Page 58

8 Maintenance

Heat exchanger cleaning

1.While burners are removed, check the heat exchanger surface for sooting. If present, heat exchanger must be cleaned and problem corrected. Proceed as follows.

2.Remove gas manifold(s)/orifice assemblies as described in steps 1 through 5 in Burner Removal and Cleaning, page 57.

3.Disconnect wiring from the hot surface igniter and hose from the burner pressure tap.

4.Remove inner jacket panel mounting screws and slide door assembly out toward front of the unit. Use caution to prevent damage to the refractory and hot surface igniter.

5.Check “V” baffles and frame runners along front and back edges of heat exchanger. Remove and clean if necessary.

6.Remove soot from heat exchanger with a stiff bristle brush. Use a vacuum to remove loose soot from surfaces and inner chamber.

7.The heat exchanger can be removed by sliding towards the front of the unit. Once the heat exchanger is removed from the unit, a garden hose can be used to wash the tubes to ensure that all soot is removed from the heat exchanger surfaces. Note: Do not wet the unit’s refractory.

8.Ensure that all burner ports are cleaned to remove any soot. See Burner Removal and Cleaning, page 57.

9.Carefully reinstall the heat exchanger, “V” baffles, and frame runners if removed from the unit. Note: Make sure frame runners seal securely where they contact the front and rear compartment refractory.

10.Carefully reinstall inner jacket panels, burners, manifolds, wires and hoses. Use new gasket material to ensure a proper air seal.

11.Reassemble all gas and water piping. Test for gas leaks.

12.Reassemble outer jacket panels.

13.Cycle unit and check for proper operation.

Electrical

This unit uses a transformer to supply a low voltage control circuit. The voltage on the secondary side should be 24 to 28VAC when measured with a volt meter. Larger models have a 7AMP circuit breaker provided on the secondary side of the transformer. A tripped circuit breaker indicates a short in the 24VAC controls that must be corrected.

Installation & Service Manual

Combustion and ventilation air

Combustion air filter

See Combustion Air Filter, page 13.

Air flow

Check frequently to be sure the flow of combustion and ventilation air to the unit is not obstructed.

Combustion air fan

These units use a fan-assisted combustion process. These units have one fan to supply combustion air to the burners.

Fan cleaning

Check combustion air fan every six months. Clean fan as required only when installed in a dusty or dirty location. Oiling is not required.

Combustion air fan adjustment

The combustion air fan is factory preset and should not need adjustment in most cases. Follow the steps below to adjust the fan if a continuous Low Air Status Code occurs.

Check for proper installation and draft in the venting system. Correct as required.

Adjusting air pressure

The following is a recommended method for setting the air pressure for the fan.

Setup procedure

To the left of the fan is an air pressure switch with a large and small tube delivering pressure from points inside the unit (see FIG. 8-2). The pressure in the large tube is the chamber pressure. By disconnecting the cap from the tee in the hose and connecting it to the "(+)" side of a manometer, you can read the air chamber pressure.

Upon a call for heat, the fan will run for about 90 seconds before going into soft lockout. If necessary, turn the power to the unit OFF and then back ON again to recycle the fan.

Note: If the unit has been firing recently, allow the unit to cool for five minutes with the fan running before beginning the adjustment procedure.

Note: Retain the plastic cap removed from the tee for reinstallation when complete.

58

Image 58
Contents What to do if YOU Smell GAS Save this manual for future referenceContents Special instructions WarrantyPlease read before proceeding Checking equipmentPrevention of freezing Safety informationOwner warning CodesCopper-fin How it works Copper-fin How it works Models 987 2067 Front View Models 987 2067 Rear View Ratings Copper-fin =B=R RatingCopper-fin Specifications Locating the unit InstallationDetermine unit location Indoor clearances from combustible constructionFreeze protection Outdoor boiler installationShut-down and draining Pump operationMinimum Recommended Combustion AIR Supply to Equipment Room Freeze Protection for a Heating Boiler System if requiredCombustion and Ventilation Air Number3Combustion air filter Models 497 Combustion air filterCombustion Air Options Outside Combustion Air, Using DuctsOutside Combustion Air, No Ducts Exhaust Fans Combustion Air from an Interior SpaceVenting support VentingGeneral information Vertical vent termination clearances and locationBarometric damper location Vent system optionsFlue Pipe Sizes Model Flue Size Flue outlet piping Conventional negative draft ventingNegative draft Common venting systemsMasonry chimney installation Inspection of a masonry chimneyOutdoor installation venting Outdoor vent/air inlet locationOutdoor vent kit Outdoor Vent Kits Model Pump Cover Without Pump CoverGas pressure test Connecting to gas supply Gas pipingGas connections Inlet GAS Pressure Natural ModelGas train and controls Suggested GAS Pipe Size for Single Unit InstallationsGas connection Fittings to Equivalent Straight PipeVenting of combination gas valves GAS Piping Size ChartCombination gas valves Checking gas supply pressureGas manifold pressure adjustment 3Measuring gas supply pressure at combination gas valve4Measuring manifold gas pressure Nat. GasWater connections Water connections heating boilers only Pressure Drop ChartBoiler circulator requirements Low system water volume Minimum boiler water temperaturesRun Cycle Output Minimum System Load Temp. Rise 8.33 60 Min Radiant floor and snow melt heating systems Low temperature return water systemsSystem Temperature Rise Chart LTV Valve Kits Model LTV Valve KITDiameter Common Manifold Size Min Models 497 Number of UnitsGPM Common Manifold Size Min Models 987 Number of Units6Primary/secondary piping of multiple boilers 7Boiler with low temperature bypass 8Primary/secondary piping with buffer tank Boiler flow rate Installation with a chilled water systemTypical heating boiler installations General plumbing rulesFilling the system Temperature / pressure gaugeBoiler bypass requirements Water treatmentAMP Draw Data Connecting to electrical supplyElectrical connections VACBurners Terminal strip connection optionsTemperature control settings Temperature adjustmentLocating the temperature control OJ1 OJ2Outdoor reset option Placement of sensors Temperature control sensorsRemote sensor for pump delay Boiler applicationRemote mounting of a sensor Remote Wire Connection Wire Gauge Max. Allowable LengthHot surface ignition system Hot surface igniter and ignition control moduleDiagnostic Status Indication Ignition and control timingsStage 2 on Operation and diagnostic lightsSequence Constant Ignition SixStartup OFFFill and test water system Freeze protection when usedCheck/control water chemistry Purge air from water systemCheck vent and air piping Check for gas leaksCheck thermostat circuits Start the boilerInitial set-up of maximum water flow Domestic water heatersWater velocity control Maximum Water Flow1Typical water heater piping with storage tank 2Single water heater piping with two storage tanks Common Manifold Size Min Models 497 Number of Units4Multiple water heater piping with multiple storage tanks Pipe size requirements Required temperature risePipe Sizing Chart 497 987 Water chemistryMinimum pump performance Potable hot water temperature control settingsDomestic water temperature Heat exchangerLocation of cold water supply piping connections Thermal expansion High water temperature limit controlOptional relief valve Cathodic protectionMaintenance Combustion and ventilation air Adjustment procedure Models 497 Ignition system checkout Sequence of operationServicing a hot surface igniter and ignition module OverviewHeat transfer process End of sequenceGlossary Igniter Controlled by Ignition Module Pump Delay Electronic Thermostat FunctionTrial for Ignition Ignition Module Function Hi-Lo Fire RelayDiagrams Ladder diagramDiagrams Connection diagram Connection diagram

497 - 2067 specifications

Lochinvar 497 - 2067 is a highly efficient and versatile condensing boiler that is designed to meet the diverse heating needs of residential and commercial applications. Known for its impressive performance and advanced technology, the Lochinvar 497 - 2067 has garnered a reputation as a reliable choice among heating professionals.

One of the standout features of the Lochinvar 497 - 2067 is its impressive thermal efficiency. The boiler boasts an efficiency rating of up to 95% AFUE (Annual Fuel Utilization Efficiency), allowing users to significantly reduce their energy costs while minimizing environmental impact. This efficiency is facilitated by its innovative condensing technology, which captures and reuses heat from exhaust gases for optimal performance.

The Lochinvar 497 - 2067 is equipped with a robust stainless steel heat exchanger designed to handle high temperatures and ensure long-lasting performance. The heat exchanger’s design maximizes heat transfer, while its corrosion-resistant properties guarantee durability over time. This contributes to the boiler's overall longevity and serviceability, reducing the need for frequent replacements.

Control is another critical feature of the Lochinvar 497 - 2067. The boiler comes with an advanced control system that enables easy management of system operations. Users can take advantage of features such as outdoor reset control, which adjusts the temperature of the boiler based on external weather conditions, enhancing system efficiency and comfort.

In terms of safety, the Lochinvar 497 - 2067 incorporates several cutting-edge safety features, including a flame detection system and multiple safety shut-off devices. These safeguards help to ensure the safe operation of the boiler, providing peace of mind to users and heating professionals alike.

Another important characteristic is the compact design of the Lochinvar 497 - 2067, which allows for flexible installation in various settings, including tight spaces. Its lightweight structure further simplifies the installation process, making it a practical choice for contractors.

In summary, the Lochinvar 497 - 2067 is an exceptional high-efficiency condensing boiler that combines advanced technology, durability, and ease of use. With its impressive thermal efficiency, superior heat exchanger design, advanced control systems, and enhanced safety measures, it stands out as a top choice for those seeking reliable heating solutions. This boiler not only meets but exceeds modern demands for energy efficiency and performance, solidifying its position in the market.