INSTALLATION INSTRUCTIONS
INSTALLATION
2.6Remove the four black screws in the firebox and lift the firebox clear. See diagram 5.
5
AR1470
2.7For Midi and Highline versions of the F40, it will be necessary to remove the base panel. This lifts up and through the upper part of the carcass. See diagram 6.
6
AR1471
2.8It will now be possible to access the two tabs for bolting the appliance down (if required). Position the stove ensuring all appropriate clearances are observed. Using a pencil mark the position of the holes in the fixing bracket. See diagram 7.
7
AR1456
2.9Remove the stove and drill the holes using a masonary drill. Insert the rawlplugs.
2.10Reposition the stove and level it using the three levelling bolts in the base. Screw the stove down. Replace the decorative base cover panel if fitted.
2.11Refit the fire box and burner unit to the stove taking care to reconnect the small TTB electrical connector to the left hand terminal and the large TTB connector to the right hand terminal. See diagram 8.
8
AR1472
2.12THE TTB CONNECTIONS IN THE INTERUPTOR BLOCK MUST HAVE THE RED HIGHLIGHTED SPADE CLOSEST THE VALVE. SEE DIAGRAM 9.
9
AR1362
2.13Having run the gas supply to the stove, PURGE THE SUPPLY, this is essential to expel any debris that may block the controls. Connect the gas supply to the 8mm test point located at the lower right hand side of the stove. A gas soundness check must be completed up to the gas inlet connection. See diagram 10.
10
AR1461
2.14Check the pull of the flue system by applying a lighted smoke pellet to the flue system opening. If there is a definite flow into the chimney, proceed with the installation, if not warm the chimney for a few minutes.
12