Stovax (P)8144**UC, (P)8120**UC, (P)8136**UC, (P)8143**UC, (P)8135**UC, (P)8128**UC manual AR1268

Page 18

INSTALLATION INSTRUCTIONS

INSTALLATION

5.5.2Place 18 small coals or pebbles around the edge of the tray as shown, ensure that there are gaps between each coal or pebble. Place one on top of the pilot shield. See diagram 11.

11

AR1267

5.5.3Starting at the front, place 18 alternating large and small coals or pebbles around the perimeter of the fire, they should sit on the bottom row of small coals or pebbles and rest against the inner mass of square blocks. See diagram 12.

12

AR1268

5.5.4Place the remaining 11 large coals or pebbles on top of the square blocks, ensure that there are gaps between each coal or pebble. See diagram 13.

13

AR1269

5.6Coal & Pebble Layout - Tahoe

5.6.1Place 10 small coals or pebbles around the edge of the tray as shown, ensure that there are gaps between each coal or pebble. See diagram 14.

14

AR1270

5.6.2Place 6 large square blocks in a solid mass in the centre of the burner tray as shown, ensure they fit tightly together. See diagram 15.

15

AR1271

5.6.3Place one large coal or pebble on top of the pilot shield, then place 10 alternating large and small coals or pebbles around the perimeter of the fire. They should sit on the bottom row of small coals or pebbles and rest against the inner mass of square blocks. Place one small coal or pebble on top of the centre of the square blocks. See diagram 16.

16

AR1272

18

Image 18
Contents Aspen, Chamonix & Tahoe Decorative Gas Basket Fires Contents Appliance Commissioning Checklist Flue Check Pass FailGAS Check Lighting the Appliance User InstructionsGeneral Turning the Appliance OFFCleaning the Fire Upgrading Your FireArrangement of Fuel BED Components Coal & Pebble Layout Small Aspen & Chamonix Coal & Pebble Layout Medium Chamonix, Large Aspen & Chamonix Coal & Pebble Layout TahoeLog & Driftwood Layout Small Aspen & Chamonix AR1276 Log & Driftwood Layout Tahoe Running Oxygen Depletion SensorFlame Failure Device ServicingHigh Site Requirements Installation InstructionsInstallation of the GAS Supply Flue and Chimney RequirementsControl Upgrade Appliance LocationInstallation InstallationSafety Precautions UnpackingArrangement of Fuel BED Components AR1265 AR1268 AR1277 AR1274 AR1278 AR1285 Commissioning CommissioningServicing / Fault Finding Charts Servicing InstructionsServicing Requirements Ignition Functional Check Ignition Functional CheckFault Finding Charts Flame Failure Functional CheckReplacing Parts Fire RemovalIgnition Lead Piezo ODS Pilot UnitMagnetic Unit Main InjectorPrimary Aeration Plate Engine Assembly Air Box Gasket Pilot Assembly Databadge GAS ValveChanging Between GAS Types Natural Gas Components LPG Gas ComponentsService Records Member of the Stovax Group